BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Tucson, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

This project consists of milling, pavement preparation, and paving of residential streets. Proposed work is to be completed within 60 consecutive calendar days from the date of the notice to proceed. SBE Goal: 4% Traffic control shall protect vehicles and pedestrian traffic in the work area and from construction equipment. Traffic control shall comply with the referenced traffic control manuals and guidelines. The Contractor shall prepare and construct a Traffic Control Plan and Detour Plan for construction for each neighborhood. The traffic control plan shall comply with all dimensions, signing, restrictions, signalization, and detours for all phases of construction. Approved detour plans shall be in-place and approved by the City of Tucson prior to starting construction. No construction shall be done unless the approved traffic control signs are in place. Contractor shall take into consideration the parking requirements and situations during the performance of the work and shall prepare a construction schedule to reflect a "construction phasing work" to ensure residents and businesses will have adequate parking at nearby streets and minimizing the inconvenience of finding distant parking during the course of the work. Convenient access to all residences and businesses shall be maintained and shall be available at all times during construction. It shall be the Contractor's responsibility to coordinate his work with the residents and businesses so as to minimize local traffic through the work area. Closure of roadways to through traffic may be allowed with prior approval of the Engineer. Requests for roadway closure shall be made in writing at least five (5) days in advance for the Engineer's review and for ample time for notification and posting.

Post-Bid

Roads / Highways

$2,000,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
5
Bidding Soon
151
All Active Projects
47
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2024

February 3, 2025

img_map_placeholder

E Stella Rd, Tucson, AZ


New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.