Site work and paving for a mixed-use development in Fort Worth, Texas. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and road / highway.
https://www.spartnerships.com/fort-worth-adopts-182m-eastside-transportation-plan-for-major-roadway-upgrades/ The Fort Worth City Council has officially adopted the Eastside Transportation Plan (ETP) for incorporation into the city’s Master Transportation Plan and Comprehensive Plan update. The ETP outlines the city’s efforts to invest $182 million into enhancing Route 89 and reconstructing East Lancaster Avenue, Brentwood Stair Road and Bridge Street. Construction is not anticipated to begin for at least another year. The plan is designed to enhance the quality of life for Eastside residents by enhancing the region’s mobility options, connectivity, infrastructure and safety features. Local communities must deal with congestion and safety issues due to the large volumes of traffic along these roadways. The projects featured in the plan will develop a pedestrian-oriented street network while accommodating multimodal transportation that provides ample connectivity while keeping vehicles moving. As part of the city’s efforts to select the ideal Locally Preferred Alternative (LPA) for the East Lancaster Avenue area, the project was split into four sections: Main Street to Riverside Drive – Section 1. Riverside Drive to Interstate Highway 820 – Section 2. Historic Handley – Section 3. Handley Drive to Dottie Lynn Parkway – Section 4. Fort Worth determined the best LPA for Section 1 was to build a four-lane road, including two lanes in each direction. The corridor will have shared-use paths on either side buffered by planting strips. The route will also include shared transit options with dedicated shelter to promote ridership. Section 2 will be turned into a managed technology corridor with three travel lanes going in each direction, separated by a green median and landscaping. Plans include installing similar shared-use paths and public transit amenities. Section 3 will undergo some of the most drastic reconstruction in the project, resulting in a four-lane bi-directional roadway in a managed technology corridor. The city plans to build shared-use paths along the north side separated from the street by buffered greenspace. In addition, the project will incorporate on-street parking, safety and operational improvements and a cross-section fitting within the existing right-of-way. The final section will be a managed technology corridor with an identical configuration to Section 1. To best serve the transit needs of residents near Route 89, the city determined that deploying high-capacity bus service would provide the most comprehensive, affordable solution. These bus routes will be implemented through a tech-based rapid transit solution, which uses traffic signal management technology, upgraded shelters, transit signal priority and other amenities to upgrade service and safety. Fort Worth will implement a series of improvements along Brentwood Stair Road and Bridge street in preparation for the Texas Department of Transportation’s (TxDOT) plans to widen IH-30. The LPA consists of building a two-lane road with lanes going in each direction that connect with direct ramps leading onto the highway. Outside of the LPAs, the ETP also includes a list of potential improvements for the area that may be implemented at a later date. These enhancements target the region’s intersections, bridges, transit infrastructure and active transportation efforts. These potential projects may include: Replacing medians. Extending and installing turn lanes. Adding crosswalks and walk signals at intersections. Installing roundabouts. Upgrading traffic signals. Building bridges. Lowering roadways. Building transit stations or hubs. Expanding high-frequency bus service. Creating transit connections. Adjusting road alignments. With the ETP officially adopted, the next step will be to adopt the Master Thoroughfare Plan amendments. The city plans to later adopt the recommended form-based code and rezone properties to match the code in early 2026. These next steps will lay the groundwork facilitating the city’s efforts to begin the reconstruction and improvement projects. Photo by Vishnu Vardhan Akula from Pexels -------------------------- https://www.spartnerships.com/north-texas-adopts-sweeping-217b-transportation-plan-to-meet-future-growth/ The Regional Transportation Council (RTC) in North Texas has approved a sprawling $217.3 billion long-range plan to improve road, rail and public transportation. The council adopted the plan, dubbed Mobility 2050, on June 12 to address multimodal transportation needs for the rapidly growing region. The RTC estimates that around 4 million people will move to North Texas by 2050. This population increase will put strain on regional transportation infrastructure and lead to increased congestion and worsened air quality. The plan is intended to improve residents’ access to essential services by promoting denser development and better use of existing transportation infrastructure rather than building new roads in undeveloped areas. This approach is designed to reduce costs, environmental impacts and household transportation expenses while accommodating future growth. Mobility 2050 allocates funds to several major categories, including: $97.5 billion for freeways, including HOV lanes and tollways. $57.9 billion for rail and bus infrastructure and procurement. $29.8 billion for infrastructure maintenance. $25.7 billion for management and operations. $6.4 billion for policy initiatives centered on growth, development and land use strategies. To finance these projects, the plan assumes the continued availability of state transportation funds through 2050, along with a projected gas tax increase of 5 to 12 cents. Officials plan to add new vehicle fees of $10 to $20 starting in 2035, while also relying on tolls and private companies. Mobility 2050 targets a wide range of specific projects, from regional rail lines in Fort Worth, Dallas and Celina to freeways, including $3.95 billion for IH30, $3.73 billion for the SE Dallas Y-Connector and $2.97 billion for US 175. The plan will now undergo a federal compliance process, with the conformity review period scheduled to end Dec. 3. While the Mobility 2050 projects await federal approval, several complementary initiatives are already set to advance. The AllianceTexas Inland Port Project has been approved for $261.8 million through Federal Highway Administration (FHWA) grants and required local matching contributions. Additionally, $182 million has been approved for the East Lancaster Avenue Complete Streets and Transit Technology Project. ----------------------------- Reconstruct Roadway 6 to 6 Lanes With Pedestrian Improvements District : Fort Worth County : Tarrant HWY : VA Limits From : Lancaster Ave/SH 180; IH 35w Limits to : Tierney Rd As of December 6 , 2025, the project is in Conceptual status. Anticipated letting Year is 2027. TXDOT - Reconstruct Roadway 6 to 6 Lanes With Pedestrian Improvements *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$167,500,000.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 5, 2027
E Lancaster Ave, Fort Worth, TX
Related To This Project
Fort Worth, TX
--
Fort Worth, TX
--
Fort Worth, TX
--
Fort Worth, TX
Bid Date: Jan 06 2025
Fort Worth, TX
Bid Date: Nov 26 2024
Fort Worth, TX
Bid Date: Dec 12 2024
Fort Worth, TX
Bid Date: Dec 12 2024
Fort Worth, TX
--
Fort Worth, TX
--
Fort Worth, TX
--
Fort Worth, TX
Bid Date: Nov 21 2024
Fort Worth, TX
Bid Date: Jan 09 2025
Fort Worth, TX
Bid Date: Jan 08 2025
Fort Worth, TX
Bid Date: Dec 19 2024
Fort Worth, TX
Bid Date: Dec 12 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.