Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 7, 2025 at 7:00 PM
Updated January 8, 2025
Renovation of an educational facility in Scituate, Massachusetts. Completed plans call for the renovation of a educational facility.
A. General Project Information: The project consists of the demolition of the existing boys locker room, showers, toilet rooms, and office space and construction of the new Boys' Locker Room including locker room, toilet and shower facilities, team rooms, and associated office space, new windows, fire protection, and MEP work including replacement of the associated rooftop HVAC unit, at Scituate High School, Scituate, MA. B. The work will include all operations necessary to deliver the locker rooms, offices, and toilet/shower facilities in a fully installed and operable condition including all utility and obtaining all necessary licenses, permits, and certificates. C. The scope of work, without limiting the generality thereof, includes all labor, materials, equipment and services required to perform the work described fully in the Drawings and Specifications and includes, but is not limited to the following major work: 1. The locker room renovation includes, but is not limited to: a. Steel framing and lintels. b. Masonry and concrete work. c. Carpentry. d. Doors, hardware, and interior windows. e. Interior finishes. f. Plumbing, HVAC, electrical, and fire protection. Boys Locker Room Renovation Scituate High School: Demolition of the existing boys locker room, showers, toilet rooms, and office space; and construction of the new Boys Locker Room including locker room, toilet and shower facilities, team rooms, and associated office space, new windows, fire protection, and MEP work including replacement of the associated rooftop HVAC unit Sub Bid Category Metal Windows, Glass and Glazing, Tile, Resilient Floors, Plumbing, HVAC, and Electrical Work Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Bid Results : 08 50 00.FSB Metal Windows Kapiloff's Glass, Inc $145,640.00 08 80 00.FSB Glass and Glazing Aluminum & Glass Concepts, Inc.$12,778.00 09 30 00.FSB Tile CJM Services, Inc $32,000.00 09 65 00.FSB Resilient Flooring CJM Services, Inc $36,250.00 22 00 00.FSB Plumbing Robert W. Irvine & Sons, Inc $60,460.00 23 00 00.FSB Heating / Ventilating / AirConditioning (HVAC) Apex Corp $210,600.00 26 00 00.FSB Electrical Work Rock Electric Datacom Inc $104,400.00
Award
Educational
$602,128.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 13, 2024
February 11, 2025
606 Chief Justice Cushing Hwy, Scituate, MA
Related To This Project
Scituate, MA
--
Scituate, MA
Bid Date: Oct 14 2020
Scituate, MA
Bid Date: Feb 11 2025
Scituate, MA
Bid Date: Feb 10 2025
Scituate, MA
Bid Date: Mar 05 2025
Scituate, MA
Bid Date: Feb 25 2025
Scituate, MA
Bid Date: Mar 13 2025
Scituate, MA
Bid Date: Mar 27 2025
Scituate, MA
Bid Date: Dec 30 2024
Scituate, MA
Bid Date: Dec 11 2024
Scituate, MA
Bid Date: Nov 26 2024
Scituate, MA
Bid Date: Dec 04 2024
Scituate, MA
Bid Date: Oct 31 2024
Scituate, MA
Bid Date: Nov 01 2024
Scituate, MA
Bid Date: Oct 07 2021
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
