Published January 30, 2025 at 7:00 PM

Updated February 4, 2025

Site work and paving for a mixed-use development in Iowa City, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

https://www.press-citizen.com/story/news/local/2024/12/26/whats-coming-to-iowa-city-in-2025/77032312007/ Court Street reconstruction An "overdue" $9.6 million reconstruction of Iowa City's Court Street is set to get underway in the spring of 2025. The project will replace pavement for roughly one mile of roadway, increase the size of sidewalks and further distance the sidewalks from the main road. Aging sewer and storm drains will also be replaced and surrounding electric and communication utilities will be buried in a "joint utility trench." ______________ https://www.press-citizen.com/story/news/local/2025/01/03/reconstructed-gilbert-street-bridge-reopens-in-iowa-city/77401682007/ The makeover of a high-traffic Iowa City bridge is complete. The Gilbert Street Bridge reopened just before calendars flipped to 2025, ending a protracted construction project that began earlier this spring. The bridge was slated to open in the late fall and nearly all of the work was completed by that deadline, but supply delays for the metal railings pushed the reopening date back. The $4.4 million project to reconstruct the bridge stemmed from a report deeming it "structurally deficient." The Iowa City City Council moved to approve funding to replace the bridge in early 2023. The bridge fully reopened to all vehicle traffic on Dec. 31. Bridge improvements include resurfaced roadway, expanded sidewalk The 50-plus-year-old road surface that makes up the bridge was completely reconstructed for this project. As part of the work, crews worked on a six-foot-wide sidewalk area with a concrete barrier for additional pedestrian protections. Streambank stabilization for Ralston Creek, which runs under the bridge, and water main improvements also took place around the bridge as part of this project. Storm drains were revamped to provide increased water draining capacity around the bridge and avoid the formation of puddles during heavy rain. A car drives over the newly opened Gilbert Street Bridge after the completion of a more than $4 million project Thursday, Jan. 2, 2025 in downtown Iowa City, Iowa. Transit detours end with the construction Six Iowa City Transit stops were disrupted when the project began last spring. This includes three stops on Court Street, at the transportation center, Dubuque Street and Gilbert Street, and three stops on Gilbert Street, at Prentiss, Bowery and Court Streets. The three temporary stops set up around the area during construction are now no longer being serviced by Iowa City Transit lines. Other infrastructure projects set to go in 2025 As one project ends, others are set to begin in the area in the new calendar year. The most substantial project slated to begin in 2025 is the Court Street Reconstruction project, beginning several blocks east of Gilbert Street. The project will look to resurface the road and introduce other related improvements between Muscatine Avenue and Iowa City High over several years at a nearly $10 million price tag. The first portion of this project is scheduled to begin in the spring. ________________________________________________________________________________________________________________________________________________________ The Project will involve the following: installation of joint utility trench; removal and installation of new storm sewer; installation of subdrain; removal of existing and installation of new sanitary sewer; abandonment, capping and removal of existing water main; installation of new water main, hydrants, fittings and services; removal of existing and installation of street and sidewalk pavement; installation of retaining walls and traffic signal systems. The project is located on Court Street between Muscatine Avenue and 1st Avenue in Iowa City, Iowa. In addition, a separate sealed envelope shall be submitted containing a completed Bidder Status Form and a bid security executed by a corporation authorized to contract as a surety in the State of Iowa, in the sum of 10% of the bid. The successful bidder will be required to furnish a Performance, Payment, and Maintenance Bond in an amount equal to one hundred percent (100%) of the contract price 2025 Stages 1A, 1B, 2A, 2B: Joint Utility Trench Early Start Date: February 10, 2025 Late Start Date: March 17, 2025 Joint Utility Trench Completion Date: August 22, 2025 Liquidated Damages: $1,000 per day Liquidated Damages will accrue each calendar day the contractor is working beyond the Joint Utility Trench Completion Date listed above, with no limit to the amount of damages that can accrue. Joint utility trench work shall be completed prior to start of 2025-2026 school year. Winter work in 2025-2026 will not be allowed without approval of the City of Iowa City. 2025 Stages 1B & 2A: Roadway Early Start Date: February 10, 2025 Late Start Date: March 17, 2025 Stage 1B & 2A: Roadway Interim Completion Date: November 21, 2025 2026 Stages 3A & 3B: Roadway Early Start Date: April 13, 2026 Stage 3A & 3B Roadway Interim Completion Date: November 20, 2026 2027 Stage 4: Roadway Early Start Date: June 9, 2027 Total Project Final Completion Date: August 20, 2027

Post-Bid

Roads / Highways

$700,000.00

Public - City

Paving, Site Work

346

7

14

5

Subscribe For Documents

68 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
89
Bidding Soon
1,097
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2024

February 10, 2025

Project location map

Court St Pl, Iowa City, IA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.