BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in Toronto, Ontario. Completed plans call for the renovation of a detention facility.

To replace the flooring in the Living Unit (Second Floor) and Meeting Spaces (First Floor) at the Keele CCC, including necessary sub-flooring and trim with equivalent. Deliverables: The Contractor must: o Remove the existing linoleum floors, surrounding trim, and transitions as per Annex D - Floor Plan Second Floor (approximately 8000 sq. ft.), and dispose of it off site as per all current environmental regulations. o Remove any existing damaged carpet tiles, surrounding trim and transitions as per Annex E - Floor Plan First Floor (approximately 1400 sq. ft.), and dispose of it off site as per all current environmental regulations. o Make all necessary repairs and preparations to the sub-floor on both the First Floor and the Second Floor, to ensure readiness for installation of the new flooring. o Install Linoleum flooring as per Annex D - Floor Plan Second Floor that meets the following specifications: - Rolled, 2.5mm thickness, eco friendly (100% biodegradable). - Colour to be confirmed by Project Authority after Contract award. o Install four (4) inch rubber trim, and appropriate transitions as per Annex D - Floor Plan Second Floor. o Install appropriate carpet tile base as per Annex E - Floor Plan First Floor. o Install Carpet Tiles as per Annex E - Floor Plan First Floor that meet the following specifications: - 24" x 24" glue down, polypropylene, solution dyed carpet tile. - Minimum two (2) millimeters thickness, maximum three (3) millimetres thick. - Lifetime Commercial Warranty. - Colour to be confirmed by Project Authority after contract award. o Install four (4) inch rubber trim, and appropriate transitions as per Annex E - Floor Plan First Floor. Any conditions for participation of suppliers not specified in solicitation documentation: none. Estimated quantity of commodity: see solicitation document statement of work and basis of payment. Duration of Contract and Time Frame for Delivery: Construction Time: The Contractor must perform and complete the Work by March 31st, 2025. Contracting Authority: Robin Riha Telephone number: 613-328-9727 E-mail: robin.riha@csc-scc.gc.ca The Crown reserves the right to negotiate with suppliers on any procurement. After contract award, bidders may request a debriefing on the results of the bid solicitation process. Bidders should make the request to the Contracting Authority within fifteen (15) working days of receipt of the results of the bid solicitation process. The debriefing may be in writing, by telephone or in person. The estimated contract period will be 3 month(s), with a proposed start date of 2024/12/30. Documents can be obtained at: https://canadabuys.canada.ca/en/tender-opportunities

Sub-Bidding

Jails / Prisons

$200,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
236
Active Projects
107
Bidding Soon
2,480
All Active Projects
978
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2024

December 30, 2024

img_map_placeholder

330 Keele St, Toronto, ON

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.