Site work and renovation of a civil project in Dayton, Texas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Estimate: $4,400,000 The work consists of providing the necessary labor, material, equipment, and supervision to construct River Ranch Wastewater Treatment Plant Expansion to 0.6 MGD for River Ranch One Investments, LTD on behalf of River Ranch Municipal Utility District No. 1. The site work contractor is responsible for all work, including but not limited to replacement of three (3) submersible pumps with all accessories, riser piping; valves and coatings at the existing lift station; bypass pumping; demolition of existing yard piping and inlets; grout fill of existing yard piping; yard piping; manholes; site work; swales; crushed concrete access roads and IWTP pad; protective coatings; concrete pads; modifications to the weirs at the existing elevated headworks; modifications to the existing lift station control panel; modifications to the existing PLC panel at the electrical rack; electrical conduit, wiring, and underground duct banks; pull boxes; bollards; all associated electrical and site work; facility start-up in its entirety; and all else specified and shown in the construction documents and not specifically addressed in lease agreement, complete in place for a fully functioning plant. The lease of the 300,000 gallon per day interim package wastewater treatment plant facilities shall include delivery and assembly of the facilities with all accessories and equipment; including aeration basins; multi-stage digester units; final clarifier; chlorine contact basin; non-potable water system; sodium hypochlorite disinfection equipment and disinfection equipment building; sodium bisulfite dechlorination equipment and dechlorination equipment; building eyewash and safety shower with canopy; walkways, bridges, and handrails; air diffusion equipment; air lifts; flow measurement equipment and PLC control panel; blowers; aboveground interconnecting piping, valves, fittings, supports; hose bibbs; control panels for equipment including the blowers, clarifier, non-potable water system, disinfection equipment and effluent flow measurement; basin lightings, and all other electrical plant devices; and electrical wiring (including wiring to the terminal boxes at Aeration Basin No. 5); and all accessories, equipment, piping, etc. within the plant, complete as specified. Within the lease scope is all the plant related functions from the stub up for the screened influent piping upstream of Aeration Basin No. 5 and the stub up for the effluent piping downstream of the chlorine contact basin; and everything in between. The installation of the leased facilities shall be the responsibility of the lease plant vendor. Installation includes all delivery, installation and start-up. The site work contractor shall coordinate with the lease plant vendor for all connections and slab dimensions. Locate project from nearest freeways, etc. At the leased facilities, the site work contractor is responsible for all site work shown in the construction drawings including all work not associated with the leased facilities. However, the site work contractor is responsible for concrete slabs and pads, and all buried piping located within the limits of the proposed leased facilities. All buried piping shall be installed with a flanged stub-up approximately 12-inches (12") above finished grade at all locations. The site work contractor shall perform all electrical work including connection from a new electrical service to the service rack including all aboveground conduit and wire to pads. The plant lease contractor is responsible for all electrical work downstream of the local control panels, including the control panels. The site work contractor is responsible for all underground duct bank work and all other electrical work from the main service rack to the local control panels for the leased equipment. The site work contractor is responsible for coordination with plant lessor firm to coordinate pipe and electrical connections, buried pipe locations, deliveries and schedules. The deadline to ask questions is 1/05/2025 10:00 AM CST

GC Bidding

Water / Sewer

$4,400,000.00

Public - County

Renovation, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
69
Bidding Soon
2,662
All Active Projects
938
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.