BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 10, 2025 at 7:00 PM

Updated January 11, 2025

Site work and new construction of a municipal facility in Celina, Ohio. Completed plans call for the construction of a municipal facility; and for site work for a municipal facility.

The project involves the construction of a 20,000 square foot steel frame storage building with metal exterior walls and roof panels, and metal interior wall panels. The building will have a concrete foundation and concrete floor, and include a 4,000 square foot office space within the main building. Engineer's Estimate $2,800,000 The City of Celina will receive sealed bids for the construction of the New Building for Public Works Department project. Bids will be received on a lump sum basis as outlined in the bid documents. Bids must be signed and submitted on the separate bidding forms included in the Bidding Documents, sealed in the provided envelope, and shall be accompanied by either a Bid Guaranty Bond in the amount of 100% of the Bid amount or by a certified check, cashier's check, or letter of credit on a solvent bank in the amount of not less than 10% of the amount of the Bid, subject to conditions provided in the Instructions to Bidders. Bid security, furnished in Bond form, shall be issued by a Surety Company or Corporation licensed in the State of Ohio to provide said surety. The successful Bidder will be required to furnish a satisfactory Performance Bond in the amount of 100% of the Bid. Attention of bidders is called to all of the requirements contained in this bid packet, particularly to the State of Ohio prevailing wage rates, various insurance requirements, and various equal employment opportunity provisions. The Owner reserves the right to reject each and every bid and to waive informalities, irregularities and errors in the bidding to the extent permitted by law. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof.

Award

Municipal

$2,086,500.00

Public - City

New Construction, Site Work

24

13

5

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
183
Active Projects
113
Bidding Soon
1,639
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 13, 2024

February 11, 2025

Project location map

To Be Determined, Celina, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.