BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 20, 2025 at 7:00 PM

Updated November 21, 2025

Demolition, site work, paving and new construction of a civil project in Meramec Township, Missouri. Working plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of November 20, 2025, per owner, engineering firm identified. The General Contractor has not been selected. Construction start date is tentatively set for late 2026. Washington County, Missouri requests statements of qualifications for engineering services to assist in its emergency bridge replacement project. The county's project will be partially funded through the Delta Regional Authority SEDAP program. The county will require plans and specifications for the proposed project and construction inspection once it is under contract. The project consists of constructing two concrete culverts on Hamilton Hollow Road in Washington County, Missouri. Information provided to the commission must include at a minimum: (a) The specialized experience and technical competence of the firm with respect to bridge design or related work (Relative Importance: Medium); (b) The capacity and capability of the firm to perform the work in question, including specialized services, within a period of 18 months, (Relative Importance: High); (c) The past record of performance of the firm with respect to such factors as control of costs, quality of work, flexibility in payments, ability to meet tight schedules (Relative Importance: High); (d) The firm's proximity to and familiarity with the area in which the project is located (Relative Importance: Low); and (e) References from all previous clients involved with the firm within the past five years on similar projects, specifically federally funded projects; (Relative Importance: Medium); (f) Documentation of compliance with E-Verify requirements. The firm will be selected based on the above qualifications. Once the most qualified firm is selected, a cost will be negotiated for design and inspection. The ability to begin work immediately, plus (b) and (c) above, shall receive primary consideration. For more information, contact Jeanette Allen at 573- 436.7704. Washington County is an Equal Opportunity Employer and invites the submission of statements of qualifications from minority and women owned firms.

Final Planning

Bridges / Tunnels

$1,000,000.00

Public - County

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
2
Bidding Soon
1,018
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2026

Project location map

Hamilton Hollow Rd, Meramec Township, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.