BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 4, 2024 at 7:00 PM

Updated December 21, 2024

Site work for a communication facility in Knob Noster, Missouri. Completed plans call for site work for a communication facility.

This SOW provides a general description of the work required but does not cover all variations that may occur during the drilling field investigation. Specifically, the variation that could be anticipated includes horizontal offset of boring locations and vertical changes in depth of penetration due to refusal or depth of native materials. B. During all field activities, the Subcontractor shall be required to meet health and safety requirements as described in the WCTS Accident Prevention Plan (APP). No Subcontractor personnel shall be allowed on site without complying with the health and safety requirements and providing Occupational Safety and Health Administration (OSHA) certifications, as described in Section 3.3.12. The cost of all health and safety equipment and procedures for work crews shall be included in the price for this work. The Subcontractor shall commence work within 10 business days of issuance of a notice to proceed by the Contractor. Work is scheduled to begin in January 2025 and is expected to last approximately 4-6 weeks. Mobilization dates will be coordinated with the Contractor The Contractor reserves the right to revise the schedule based on project requirements. Question Deadline 12/13/2024 at 4:00 PM CT.

Post-Bid

Communication

$500,000.00

Public - Federal

Site Work

3

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
88
Bidding Soon
1,103
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2024

January 1, 2025

Project location map

374 SE 1151st Rd, Knob Noster, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.