BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 7, 2025 at 7:00 PM

Updated November 8, 2025

Site work for a water / sewer project in Knob Noster, Missouri. Completed plans call for site work for a water / sewer project.

**As of November 7th, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** The project consists: Preparing the tank interior and exterior, recoating, replacing vent, replacing wet bowl ladder, and necessary appurtenances. A pre-bid conference and inspection trip is scheduled for prospective bidders at: None scheduled at this time. Attendance is not mandatory. PROJECT SUMMARY The project is financed in part by the Coronavirus State and Local Fiscal Recovery Funds (SLFRF) program through the American Rescue Plan Act (ARPA). The Contractor may be required to provide additional information or assist the City of Knob Noster with reporting as required by SLFRF and ARPA. Project has to be completed and closed by August 1,2026. The project shall consist of interior and exterior tank surface preparation. Interior shall be sand blasted, cleaned and coated. Exterior shall be water blasted, cleaned and coated. For the exterior, an alternate bid item to sand blast, clean and coat is provided. The coating was tested with the results showing high barium construction and it is assumed both the interior and exterior coatings contain the barium concentration. The Contractor shall also supply and install: Stainless steel overflow screen, interior bowl ladder and fall arrest cable equipment, new gaskets on all openings, new tank vent, repair concrete foundation with grout, clean concrete and coat with epoxy repair all pits and holes I the tank, cleanup, startup, and disinfect the tank. An 11 month inspection will be required an any repairs made by the Contractor Question Deadline Sep 12, 2025 The Engineer will consider such questions submitted in writing at least five (5) days prior to bid opening *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. **Maguire Water requests sub bids no later than 11:00 AM on September 15, 2025.

Bid Results

Water / Sewer

$183,750.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

16

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
194
Active Projects
105
Bidding Soon
1,220
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2025

October 17, 2025

Project location map

400 Southeast Road 25, Knob Noster, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.