Published November 7, 2025 at 7:00 PM
Updated November 8, 2025
Site work for a water / sewer project in Knob Noster, Missouri. Completed plans call for site work for a water / sewer project.
**As of November 7th, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** The project consists: Preparing the tank interior and exterior, recoating, replacing vent, replacing wet bowl ladder, and necessary appurtenances. A pre-bid conference and inspection trip is scheduled for prospective bidders at: None scheduled at this time. Attendance is not mandatory. PROJECT SUMMARY The project is financed in part by the Coronavirus State and Local Fiscal Recovery Funds (SLFRF) program through the American Rescue Plan Act (ARPA). The Contractor may be required to provide additional information or assist the City of Knob Noster with reporting as required by SLFRF and ARPA. Project has to be completed and closed by August 1,2026. The project shall consist of interior and exterior tank surface preparation. Interior shall be sand blasted, cleaned and coated. Exterior shall be water blasted, cleaned and coated. For the exterior, an alternate bid item to sand blast, clean and coat is provided. The coating was tested with the results showing high barium construction and it is assumed both the interior and exterior coatings contain the barium concentration. The Contractor shall also supply and install: Stainless steel overflow screen, interior bowl ladder and fall arrest cable equipment, new gaskets on all openings, new tank vent, repair concrete foundation with grout, clean concrete and coat with epoxy repair all pits and holes I the tank, cleanup, startup, and disinfect the tank. An 11 month inspection will be required an any repairs made by the Contractor Question Deadline Sep 12, 2025 The Engineer will consider such questions submitted in writing at least five (5) days prior to bid opening *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. **Maguire Water requests sub bids no later than 11:00 AM on September 15, 2025.
Bid Results
Water / Sewer
$183,750.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
16
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 17, 2025
October 17, 2025
400 Southeast Road 25, Knob Noster, MO
Related To This Project
Knob Noster, MO
Bid Date: Nov 26 2025
Knob Noster, MO
Bid Date: Feb 17 2026
Knob Noster, MO
Bid Date: Jun 20 2025
Knob Noster, MO
Bid Date: Apr 04 2025
Knob Noster, MO
Bid Date: Dec 20 2024
Knob Noster, MO
Bid Date: Dec 23 2024
Knob Noster, MO
Bid Date: Dec 20 2024
Knob Noster, MO
Bid Date: Dec 18 2024
Knob Noster, MO
Bid Date: Dec 18 2024
Knob Noster, MO
Bid Date: Nov 22 2024
Knob Noster, MO
Bid Date: Sep 17 2024
Knob Noster, MO
Bid Date: Oct 18 2024
Knob Noster, MO
--
Knob Noster, MO
Bid Date: Aug 16 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.