Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 23, 2025 at 7:00 PM
Updated January 24, 2025
Renovation of a pre-engineered storage facility in Beverly Hills, Michigan. Completed plans call for the renovation of a pre-engineered storage facility.
Anticipated start date is April 14th, 2025. Concrete - Culver development - $147,000. General Trades - City contracting services -$125,000 Electrical - Dehondt - $50,325 Site work - True North asphalt - $119,571 Total: $441,896.00 BP2-20Maintenace Building and Fire alarm upgrades All questions shall be directed to Drew Gardner, at drew.gardner@bartonmalow.com and/or (947)-426-1425 with the following subject line: "BPS BP #2-20 Request for Clarification," prior to Wednesday, December 11, 2024 at 1:00 p.m. Bid security by a quality surety in the form of a bid bond, cashier check, or certified check in the amount of five percent (5%) of the Bid/Quote/Proposal amount shall be submitted with the Bid. All cashier's checks must be scanned and submitted electronically through online by bid opening and be delivered to 31301 Evergreen Rd., Beverly Hills, Michigan 48025-3800, Attention: Kevin Taratuta, Chief Finance and Operations Officer within 48 hours of bid opening. The District will not consider a Bid that does not include a bid security. Bidders will be permitted to withdraw their Bid, unopened, after it has been submitted if so requested prior to the time specified above for opening of Bid. The successful bidder shall be required to enter into a contract with Birmingham Public Schools. The successful bidder shall pay all taxes required by law. Bidders must provide familial disclosure in compliance with MCL 380.1267 and submit this with their Bid. The Bid will be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the owner or any employee of the bidder, and any member of the Board of Education of the school district, or the Superintendent of the school district. The District will not consider a Bid that does not include this sworn and notarized disclosure statement. Each Bid must be accompanied by a sworn and notarized statement certifying that the Bidder is not an "Iran Linked Business" within the meaning of the Iran Economic Sanctions Act. The District will not consider a Bid that does not include this sworn and notarized statement. The right to reject any or all Bids, either in whole or in part, or to waive any informalities or irregularities therein, is reserved by Birmingham Public Schools. The Board of Education will not consider or accept a Bid received by the Board after the date and time specified for receipt of Bid. Concrete - Culver Development $147,000.00 General Trades - City Contracting Services $125,000.00 Electrical - MHM Construction LLC $54,317.03 Site Work - Blue Star, Inc. $33,800.00
Award
Warehouse / Distribution - Pre-Engineered Storage Building
$441,896.00
Public - County
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 18, 2024
January 17, 2025
To Be Determined, Beverly Hills, MI
Related To This Project
Beverly Hills, MI
Bid Date: Dec 13 2024
Beverly Hills, MI
Bid Date: Jan 16 2025
Beverly Hills, MI
Bid Date: Jan 14 2025
Beverly Hills, MI
Bid Date: Jan 30 2025
Beverly Hills, MI
Bid Date: Jan 21 2025
Beverly Hills, MI
Bid Date: Feb 12 2025
Beverly Hills, MI
Bid Date: Jan 30 2025
Beverly Hills, MI
Bid Date: Mar 04 2025
Beverly Hills, MI
Bid Date: Dec 03 2024
Beverly Hills, MI
Bid Date: Nov 19 2024
Beverly Hills, MI
Bid Date: Nov 26 2024
Beverly Hills, MI
Bid Date: Nov 26 2024
Beverly Hills, MI
Bid Date: Nov 05 2024
Beverly Hills, MI
Bid Date: Oct 29 2024
Beverly Hills, MI
Bid Date: Oct 22 2024
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
