Published January 17, 2025 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Gadsden, Alabama. Completed plans call for site work for a water / sewer project.

Plans and specifications are for viewing purposes only and in order to be considered an official bidder contractors must obtain plans and specifications from Goodwyn Mills & Cawood LLC. The Project includes the following Work: Approx. 400 LF of 12" Fusible PVC Force Main Inside of 16" Fusible PVC Encasement installed via directional drilling under Interstate 59. Approx. 400 LF of 16" Fusible PVC Water Main Inside of 24" Fusible PVC Encasement installed via directional drilling under Interstate 59. Installation of all other related appurtenances. may obtain copies of the Bidding Documents from the Issuing Office as described below. Copies of the Bidding Documents may be obtained from the Issuing Office, during the hours indicated above, upon payment of a deposit of $20.00 for a one-time administrative fee for digital access/file sharing and/or $100.00 for each set. Said cost represents the cost of printing, reproduction, handling, and distribution, therefore no refund will be granted. Checks for Bidding Documents shall be payable to "GMC." Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. Bid security shall be furnished in accordance with the Instructions to Bidders. The Owner reserves the right to waive any informalities, or to reject any or all bids, and to award the contract to the best and most responsible bidder. All bidders shall submit, upon request, a list of projects "successfully completed" in the last 2 years, having a similar scope of work and approximate construction cost as specified in this project. All bidders must comply with requirements of the Contractor's Licensing Law of the State of Alabama and be certified for the type of work on which the proposal is submitted. Each bidder must deposit, with his bid, security in the amount, form, and subject to the conditions provided in the Instructions to Bidders. All Bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the provisions of Title 34, Chapter 8, Code of Alabama, 1975, and must show evidence of license before bidding or bid will not be received or considered by the Engineer; the Bidder shall show such evidence by clearly displaying the license number on the outside of the envelope in which the Proposal is delivered. No bidder may withdraw his bid within 60 days after the opening thereof. All questions or comments must be received by 12:00 P.M., Tuesday, December 3, 2024.

Bid Results

Water / Sewer

$1,352,520.00

Public - County

Site Work

14

23

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Contingency Allowances, Quantity Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Vapor Retarders
Division 08 - Openings

Division 08 - Openings

Hardware
Division 11 - Equipment

Division 11 - Equipment

Foodservice Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Multiple Seating, Pews and Benches, Benches
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Low-Voltage Switchgear
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
57
Bidding Soon
741
All Active Projects
372
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 10, 2024

February 10, 2025

img_map_placeholder

I-59, Gadsden, AL

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Northeast Alabama Regional Megasite Interstate 59 Utility Crossings

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.