BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 7, 2025 at 7:00 PM

Updated January 8, 2025

Demolition, site work, new construction and renovation of a municipal facility in Port Arthur, Texas. Completed plans call for the demolition of a municipal facility; for the construction of a municipal facility; for the renovation of a municipal facility; and for site work for a municipal facility.

San Antonio Avenue Rehabilitation and Block Alley Reconstruction Bids Received After the Deadline Stated Above, Regardless of Method of Delivery, Will Not Be Considered And Returned Unopened. Per Chapter 2 Article Vi Sec. 2-262(C) of the City's Code of Ordinance, the City Council Shall Not Award a Contract to a Company That is in Arrears in Its Obligations to the City. Excavate areas as shown on the plans or as directed. Remove materials encountered to the lines, grades, and typical sections shown on the plans and cross-sections. Prepare and treat existing or newly constructed surface with an asphalt binder or other specialty prime coat binder material. Apply blotter material as required. Construct a hot-mix asphalt (HMA) pavement layer composed of a compacted, dense-graded mixture of aggregate, asphalt binder, and additives mixed hot in a mixing plant. Payment adjustments will apply to HMA placed under this Specification unless the HMA is deemed exempt in accordance with Section 341.4.9.4., "Exempt Production." Establish and remove offices, plants, and facilities. Move personnel, equipment, and supplies to and from the project or the vicinity of the project site to begin work or complete work on Contract Items. Bonds and insurance are required for performing mobilization. For Contracts with emergency mobilization, provide a person and method of contact available 24 hrs. a day, 7 days a week unless otherwise shown on the plans. The time of notice will be the transmission time of the written notice or notice provided orally by the Department's City's representative. The amount bid for Mobilization must not exceed ten percent (10%) of the total contract price, excluding the price bid for Mobilization, and in no case will payment under this item exceed the original price bid for this item. Prior to commencement of construction activities, the Contractor must post the following documents in a prominent and accessible place where they may be easily viewed by all employees of the prime Contractor and by all employees of subcontractors engaged by the prime Contractor: Davis Bacon Wage Poster (WH 1321) - DOL "Notice to All Employees" Poster; and Applicable Davis-Bacon Wage Rate Determination. These notices must remain posted until final acceptance of the work by the Owner. Provide, install, move, replace, maintain, clean, and remove all traffic control devices shown on the plans and as directed. The Contractor shall construct and maintain in a safe condition any temporary connections necessary for ingress to and egress from abutting property or intersecting roads and streets. Temporary work zone (TWZ) traffic control devices manufactured after December 31, 2019, must have been successfully tested to the crashworthiness requirements of the 2016 edition of the AASHTO Manual for Assessing Safety Hardware (MASH). An exception to the manufacture date applies when, based on the project's date of letting, a category of MASH-2016 compliant TWZ traffic control devices was not approved, or was not self-certified. In such case, devices that meet NCHRP-350 or MASH-2009 may be used. Temporary work zone (TWZ) traffic control devices manufactured on or before December 31, 2019, must at a minimum have been successfully tested to the crashworthiness requirements of NCHRP-350 or MASH-2009. These devices may continue to be used throughout their normal service lives. Such TWZ traffic control devices include: o portable sign supports, o barricades, o portable traffic barriers designated exclusively for use in TWZs, o crash cushions designated exclusively for use in TWZs, o longitudinal channelizers, and o truck-mounted attenuators (TMAs) and trailer attenuators (TAs). Category I devices (i.e., lightweight devices), such as cones, tubular markers, and drums without lights or signs attached, may be self-certified by the vendor or provider, with documentation provided to the Department, or as shown on Department's Compliant Work Zone Traffic Control Device List. Install, maintain, and remove erosion, sedimentation, and environmental control measures to prevent or reduce the discharge of pollutants in accordance with the Storm Water Pollution Prevention Plan (SWP3) on the plans and the Texas Pollutant Discharge Elimination System (TPDES) General Permit TXR150000. Control measures are defined as Best Management Practices used to prevent or reduce the discharge of pollutants. Control measures include, but are not limited to, rock filter dams, temporary pipe slope drains, temporary paved flumes, construction exits, earthwork for erosion control, pipe, construction perimeter fence, sandbags, temporary sediment control fence, biodegradable erosion control logs, vertical tracking, temporary or permanent seeding, and other measures. Erosion and sediment control devices must be selected from the Erosion Control Approved Products or Sediment Control Approved Products lists. Perform work in a manner to prevent degradation of receiving waters, facilitate project construction, and comply with applicable federal, state, and local regulations. Ensure the installation and maintenance of control measures is performed in accordance with the manufacturer's or designer's specifications.

Bid Results

Municipal

$686,744.00

Public - City

Demolition, New Construction, Renovation, Site Work

52

10

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
51
Bidding Soon
864
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2024

January 17, 2025

Project location map

San Antonio Ave, Port Arthur, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.