BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a mixed-use development in Rio Dell, California. Completed plans call for site work for a playground / park / athletic field.

Phase II of the Dog Park includes approximately 80 lineal feet of four-foot black vinyl-coated chain link fence, with one four-foot man gate and one eight-foot swing gate. The chain-link fence material shall be a minimum 9 gauge, 2-3/8" corner posts, 1-7/8" line posts spaced no more than 8' on-center, 1-5/8" top rail and a minimum 9-gauge bottom wire. Fence material, post and gates shall be black vinyl coated or powder coated. Posts shall be set in a minimum 6-inch- wide, 15-inch deep holes, set in concrete, posts to extend 12 inches into the concrete. The project includes removing and relocating approximately 8 lineal feet of existing fencing, an 8' x 8' x 4" concrete slab (approximately 1 cubic yard) with #4 grade 40 rebar (approximately 80 lineal feet) 24" on-center each way over a 6-mil vapor barrier (approximately 80 square feet), over a 4" compacted crushed gravel base (approximately 1.5 cubic yards). Estimated Issue Notice to Proceed January 14, 2025 Opinion of Probable Cost: Based on previous submittals, the City estimates the cost of Phase Il to be between $6,000 and $6,500. REQUIRED LICENSE Contractors shall possess either a Class A General Engineering Contractor's License, a Class B General Contractor's License, or a Class C-13 Fencing Contractor's License. Question Deadline 12/09/2024 All questions shall be submitted in writing. Please direct any questions regarding the project or proposal submission process to Kyle Knopp, City Manager, at knoppk@cityofriodell.ca.gov. The successful proposer must then submit to the City complete, executed contract documents & the required insurance and bonding documents, without modification, within fourteen (14) calendar days after receiving the written Notice of Award. See Attachment B. Such required documents include, but are not limited to, a payment or labor and materials bond in an amount of one hundred percent (100%) of the amount payable by the terms of the project contract and that satisfies the requirements of California Civil Code Section 3248, and a performance bond in an amount of one hundred percent (100%) of the amount payable by the terms of the contract. All project bonds must be executed by an admitted surety insurer in accordance with applicable law and acceptable to the City. As liquidated damages for delay Contractor shall pay City Five Hundred dollars ($500.00) for each Day that expires after the time specified herein for Contractor to achieve Substantial Completion of the entire Work, until achieved. The City of Rio Dell reserves the right to reject any and all proposals. This Request for Proposals does not commit the City to award the contract, pay any costs incurred in the preparation of proposals, or to procure or contract for supplies or services. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Playgrounds / Parks / Athletic Fields

$6,500.00

Public - City

Site Work

3

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
2
Bidding Soon
33
All Active Projects
14
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2024

January 14, 2025

img_map_placeholder

210 Center St, Rio Dell, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.