BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 14, 2025 at 7:00 PM

Updated February 15, 2025

Site work, paving and outdoor lighting for a mixed-use development in Hilliard, Ohio. Completed plans call for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; sidewalk / parking lot; water / sewer project; and for paving for a sidewalk / parking lot.

The city is requesting proposals for renovating the pavement, lighting and water features in First Responders Park. This park was constructed in 2009-2010 and is being renovated to meet the 25th anniversary of 9-11 in 2026. All work shall be completed per the specifications and comments contained herein and per the marked plans in Exhibit #1, concrete scoring plan in Exhibit #2, fountain pipe & equipment plan in Exhibit #3, the original bid drawings in Exhibit #4, and RAMCO Installation Guide in Exhibit #5. 01/03/2025 11:00 AM EST Any Contractor questions on the technical plans & specifications shall be entered in the Q&A. Addenda will be issued if necessary. The City is requesting proposals for a lump sum proposal to provide the renovations for the First Responders Park. The city has secured funding for this project though the City of Hilliard 2025 Capital Improvement Budget and the State of Ohio OTSCIF funding approved for 2024-2025. This park was constructed in 2009-2010 and will be renovated to meet the rededication of the park on September 11, 2025. All work shall be completed per the specifications and comments contained herein and per the marked plans in Exhibit #1, concrete scoring plan in Exhibit #2, fountain pipe & equipment plan in Exhibit #3, the original bid drawings in Exhibit #4, the Ramco Panel Installation Guide in Exhibit #5, and the Temporary Fence Plan in Exhibit #6. The Engineer's Estimate for this Bid is $875,000.00. No bid will be accepted if it exceeds the City Engineer's estimate on the bid by more than ten percent (10%). The Final Completion Date is August 7, 2025. This project is being funded through local and state funds. State prevailing wage applies to this project. There is no DBE goal.

Award

Playgrounds / Parks / Athletic Fields

$713,000.00

Public - City

Outdoor Lighting, Paving, Site Work

63

5

4

5

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
273
Active Projects
174
Bidding Soon
2,789
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 17, 2025

February 11, 2025

Project location map

Multiple Locations, Hilliard, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.