Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 27, 2024 at 7:00 PM

Updated November 28, 2024

This is a service / maintenance or supply contract in Mount Vernon, Washington. Contact the soliciting agency for additional information.

Provide Engineering, Surveying, Permitting, and Environmental Services for the Riverside Drive Improvements The City of Mount Vernon solicits interest from consulting firms with expertise in in civil engineering, surveying, permitting, right-of-way acquisition, and related professional services Project Description The work to be performed by the selected consultant consists of preparing preliminary engineering design, permitting documentation and applications, and right-of-way (ROW) plan documentation to support improvements to Riverside Drive in Mount Vernon, Washington. The extent of the Riverside Drive Improvements - 2 project extends from the Skagit River Bridge/north City boundary and the intersection with College Way. The proposed improvements include pedestrian accessibility improvements at intersections, pavement mill and thin overlay, channelization, utility relocation, and stormwater utility improvements. This project is funded through a transportation federal aid grant and has a Disadvantaged Business Enterprise goal of 16%. Major features of the project scope will include: Pedestrian accessibility improvements to meet applicable Americans with Disabilities guidelines. Pavement surface preservation through a mill and thin overlay, including channelization and similar pavement surface restoration requirements. Relocate overhead utilities underground, preferably in a shared-use utility trench on the west side of Riverside Drive. Stormwater utility improvements, as needed to meet federal and state permitting and regulatory requirements Environmental documentation and preparation of permit applications for National Environmental Policy Act (NEPA) review and applicable local permitting requirements. Determination of ROW needs and ROW plan preparation This negotiated-hourly rate agreement will extend from approximately March 2025 through March 2027 with the option for the City of Mount Vernon to extend it for additional time and money if necessary. The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
393
Active Projects
166
Bidding Soon
2,891
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2025

Project location map

Riverside Dr, Mount Vernon, WA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed