BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 8, 2025 at 8:00 PM

Updated October 9, 2025

This is a service / maintenance or supply contract in Raleigh, North Carolina. Contact the soliciting agency for additional information.

The University seeks the professional services of a Surveying Firm to support Cates West Development project. Surveying services will include surveying and mapping and subsurface utility engineering services (SUE). In addition, SUE Level A Test Holes will be included as needed and as identified by the project Engineers. This project will provide new student housing and dining facilities in multiple phases to address increasing demand driven by enrollment growth and the freshman live-on campus requirement. The project will construct about 3000 traditional and semi-suite style student beds and a new 1500-seat dining facility on Central Campus. Three existing student housing buildings, a dining facility, and a small service building at the end of their useful lives will be demolished as part of this multi-phase project. The goal is to continue to increase the bed count with each phase. The project includes a new regional utility plant and utility distribution. Project Site: The project site is located in the Central Campus precinct. The site is approximately 35 acres and is bounded by Thurman Drive and the railroad to the North; the Western edge of Lee Field to the West; Rocky Branch Creek to the South; and Dan Allen Drive to the East. In addition, the survey shall include an area bounded by Cates Avenue to the North; Dan Allen Drive to the West; Rocky Branch Creek to the South; and Carmichael Wellness and Recreation Center to the East. Existing buildings on the site that are planned to be demolished as part of the project include Lee Residence Hall, Sullivan Residence Hall, Bragaw Residence Hall, Fountain Dining Hall and the West Dunn Building. Finish floor elevations will be needed for these structures. The designer selection process is scheduled to be complete by mid-January 2024, with contracting expected to occur in February 2024. The selected firm shall be ready to kick-off the survey as soon as contracting is complete, and work diligently and fully staffed until completion of the survey. We anticipate the draft survey to be delivered in mid-May or sooner. The method of Contractor Selection has not been Determined at this time. All questions and project submittals are to be directed to: Laura Zaytoun Project Manager, Design and Construction 919-513-0056 llzaytou@ncsu.edu

Conceptual

Educational

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
239
Active Projects
141
Bidding Soon
1,732
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 13, 2025

Project location map

Thurman Dr, Raleigh, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.