Published January 22, 2025 at 7:00 PM

Updated January 23, 2025

Site work for a water / sewer project in San Jose, California. Completed plans call for site work for a water / sewer project.

The Project generally involves in general, but not limited to: pre-construction CCTV of 35 6-inch to 10-inch vitrified clay pipe (VCP) segments (approximately 10,098 linear feet), point repairs to existing segments where recommended by the Contractor and agreed to by the Engineer, and installation of cured-in-place liner (CIPP) to all segments. This project also includes the rehabilitation of 11 manholes, reconnection of active sanitary sewer service laterals, and reinstatement of active sanitary sewer service laterals. Question Deadline 12/26/2024 at 11:00 AM PT Bidders must submit questions or requests for information concerning any part of this bid in writing to the City via online. The City will not respond to any communication or question submitted directly to City staff or City consultants. This project is a "public works" as defined in Sections 1720 through 1720.6 of the California Labor Code. In accordance with Chapter 14.09 of the San Jose Municipal Code entitled "Prevailing Wage Requirements for City Contracts Involving Public Works," the contractor will be required to comply with the prevailing wage provisions in California Labor Code Sections 1720 through 1861, and the City's Office of Equality Assurance is authorized to provide certain local enforcement of those provisions. As such, the contractor will need to pay not less than the general prevailing rate of per diem wages and the general prevailing rates for holiday and overtime work. See Section 7-1.01a(3) of the Special Provisions for the prevailing wage requirements applicable to the contract. Copies of the prevailing rate of per diem wages and the general prevailing wage rates for holiday and overtime work in effect for this project are on file and available for your review from the City's Office of Equality Assurance at 408-535-8430. This project is subject to the Project Labor Agreement ("PLA") entered between the City of San Jose and the Santa Clara and San Benito Counties Building & Construction Trades Council, as may be amended from time to time. The awarded Bidder will be required to agree to the terms of the agreement by signing Addendum A - Agreement to be Bound, of the PLA agreement, and submit at the time the contract is executed. See Attachment 6 for a copy of the PLA including Addendum A. Each bid must be accompanied by an electronic pdf copy of a bidder's bond in the sum of not less than 10% of the total aggregate amount of the bid. Bonds must be issued by a surety that is an "admitted surety insurer" in the State of California and must name the City of San Jose as beneficiary. Bonds must be accompanied by an electronic pdf copy of the surety's power of attorney and a notary acknowledgement for the surety's signature. Bidders must retain the original wet-signed bidder's bond and provide it to the City upon request. Bidder's attention is directed to those provisions of the Specifications which require the contractor to whom the contract for the work is awarded, to file with the City Clerk at the time the contract is executed, a Contractor's Payment Bond and a Bond for Faithful Performance meeting all the requirements of the Specifications and approved by the City Attorney of the City of San Jose. Bonds must be issued by a surety that is an "admitted surety insurer" in the State of California possessing a power of attorney and shall name the City of San Jose as beneficiary. The Contractor's Faithful Performance Bond shall be for 100% of the contract amount. Contractor's Payment Bond shall be for 100% of the contract amount. Pursuant to the terms and conditions set forth in Public Contracts Code Section 22300, the contractor may substitute certain securities for any money withheld by City as retention to ensure contractor's performance under the contract. Such substitution of securities in lieu of retention shall be at the contractor's request and at contractor's sole expense. The securities shall be in an amount equivalent to the retention to be released.

Award

Water / Sewer

$1,843,285.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

12

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
378
Active Projects
152
Bidding Soon
2,487
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2025

March 10, 2025

Project location map

Multiple Locations, San Jose, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.