BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 17, 2025 at 8:00 PM

Updated April 18, 2025

Site work and new construction of a fire / police facility in Libertyville, Illinois. Design plans call for the construction of a 35,000-square-foot, 30-space fire / police facility; and for site work for a fire / police facility.

As of April 17, 2025, per owner, design team has been approved by the Village Board. Design expected to take approximately 9 months. Construction expected to take 22 months. The scope of work is generally described as providing the Village with comprehensive architecture and design services to complete a design, prepare construction documents, assist with the public construction bid process, and provide construction engineering support services related to a new Police Station. The Mayor and Village Board of Trustees have determined that a new police station facility is necessary in order to conduct departmental operations for continued recruitment, retention and to modernize the layout to accommodate current operations. A facilities study was completed in 2022 and outlined the need for an approximate 35,000 square foot free standing building in order to accommodate these needs. The Village of Libertyville currently anticipates needing a +/- 35,000 SF building. The Project program includes the following: 1. Indoor Parking for 30 police vehicles 2. A modern firing range sized to allow for tactical training. 3. Additional capacity for future growth of sworn and civilian staff. 4. An Emergency Operations Center (EOC) / Multi-Purpose Room 5. A Defensive Tactics Training Room 6. Social Services Rooms / Offices The new police station facility will replace the existing station located at 200 E. Cook Avenue, LibertyRville,Illinois. The existing Police Station is planned to the demolished. The new building is assumed to include at least one above ground floor and a basement level.Plats of survey, topographic surveys, geotechnical reports, traffic and utility studies, environmental studies, and other similar information. will need to be completed for the Project site by the Owner. Questions should be addressed to Village Administrator Kelly Amidei at kamidei@libertyville.com.

Design

Fire / Police

$30,000,000.00

Public - City

New Construction, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
526
Active Projects
289
Bidding Soon
3,798
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2026

Project location map

200 E Cook Ave, Libertyville, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.