BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 29, 2025 at 7:00 PM

Updated January 30, 2025

Site work for a road / highway in Grafton, Wisconsin. Completed plans call for site work for a road / highway.

** As of January 29, 2025, project was awarded to Vinton Construction Company , awarded amount is $ 409,202. ** New traffic signal as follows: Approximately 2 EACH Poles Type 10 Approximately 2 EACH Poles Type 10-Special Approximately 4 EACH Concrete Bases Type 1 Approximately 2 EACH Concrete Bases Type 10 Approximately 2 EACH Concrete Bases Type 10-Special Approximately 910 LF Conduits Approximately 8 EACH Pull Boxes Steel 24X24-INCH Approximately 1 EACH Control Cabinet Approximately 1,855 LF Cable Traffic Signals Approximately 2,440 LF Electrical Wiring Approximately 2 EACH Monotube Arms 20-FT Approximately 1 EACH Monotube Arms 35-FT-Special Approximately 1 EACH Monotube Arms 45-FT-Special Approximately 16 EACH Traffic Signal Face Approximately 1 EACH Traffic Signal Controller Fully Actuated Approximately 1 EACH Video/Radar Vehicle Detection System Approximately 1 EACH Emergency Vehicle Detection System Clearing/Grubbing, Removals, Excavation, Traffic Control, Base Aggregates, Concrete Curb & Gutter, HMA Pavement, Epoxy Pavement Marking, and other miscellaneous items. All work on this contract shall be substantially completed by September, 1, 2025 with final completion by September 30, 2025. Bidders shall file Contractor's Qualification Statement 7 calendar days prior to bid opening. The Village reserves the right to reject any and all bids, waive any informalities or irregularities in bidding or accept any bid or bids which, in the opinion of the Village, shall serve the Village's best interest. No bid may be withdrawn for a period of sixty (60) days after the time and date set for the opening thereof, without the consent of the Village.

Award

Roads / Highways

$409,202.00

Public - City

Site Work

44

6

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
244
Active Projects
140
Bidding Soon
1,389
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2024

March 17, 2025

Project location map

Port Washington Rd & Falls Rd, Grafton, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.