BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Norman, Oklahoma. Completed plans call for the renovation of a educational facility.

Project Name: NPS Longfellow Middle School Improvements 1. Longfellow Middle School : 215 North Ponca Avenue, Norman , Oklahoma 73071. A. The General Conditions, Supplementary Conditions, Special Conditions and Division 1 are hereby made a part of each of the technical sections that follow, and shall be understood to apply in full to all individuals or corporations who contract or sub-contract to perform any part or all of the project work. B. The Drawings and Specifications are complementary. Indications on the working drawings or in any section of the specifications of an article or material, operation or method requires that the contractor shall provide each item or service or quality or is subject to qualifications noted; and, the contractor shall perform each operation prescribed according to the conditions stated providing, therefore, all necessary labor, equipment and incidentals to complete the project work. C. In the case of a conflict between the Drawings and the Specifications, the more restrictive and/or expensive of the two shall take precedence. Contractor shall notify the Architect of any conflict before proceeding with the work. After the bid letting, the successful sub-contractor shall submit in duplicate, manufacturer's color charts for all items requiring the architect's decision concerning colors, textures and patterns except for those materials where color, pattern, and texture are specified herein. The Architect will then prepare a finish material color schedule. A. Scope of demolition and removal work is indicated on drawings and specified in Section 02 4100. B. Scope of alterations work is indicated on drawings. C. The scope of the work includes all work included in the Base Bid and such additional work as may be properly authorized by the Owner through issuance of addenda, field orders, and change orders; or acceptance of Alternates or unit prices. D. The Contractor shall provide all labor, materials, tools, accessories, equipment, and incidentals required to complete all work specified or reasonably implied therein, as falling within the Scope of Work on this project. E. If Add Alternate #6 is awarded, contractor shall remove and store existing washer and dryer. Reinstall existing washer and dryer and provide new hook-ups and required utilities as described here and shown on the drawings. A. Norman Public Schools intends to continue to occupy adjacent portions of the existing building during the entire construction period. B. Norman Public Schools intends to continue to occupy existing buildings near the Project during the entire construction period. C. Cooperate with Norman Public Schools to minimize conflict and to facilitate Norman Public Schools operations. Online Bid Opening: Meeting ID: 224 553 564 070 Passcode: tR2aL3BM Or call in (audio only): +1 539-222-3529,,798467778# Phone Conference ID: 798 467 778#.

Post-Bid

Educational

$300,000.00

Public - City

Renovation

37

18

50

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
31
Bidding Soon
382
All Active Projects
156
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 10, 2024

January 9, 2025

img_map_placeholder

215 N Ponca Ave, Norman, OK


New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.