BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a library in Amarillo, Texas. Completed plans call for the renovation of a library.

The City of Amarillo is soliciting bids for material, labor and equipment to replace the carpeting at North Branch Library per the bid scope of work. Questions Due Date: Dec 23rd 2024, 5:00 PM CST. The City of Amarillo intends to replace the carpeting at North Branch Library, located at 1504 N.E. 24th St. Amarillo, TX 79107 New carpeting shall replace all existing carpeting, excluding carpeting under stationary shelving. Breakroom and hallway shall be replaced with LVT. New carpeting and cove base shall be installed in the "Meeting Room". The carpeting shall be installed over existing VCT. Contractor shall remove and then replace all cove base in areas where carpet is replaced (cove base behind wall shelving will be excluded). Contractor shall be responsible for moving furniture, coordinating with the ODR is mandatory. The City of Amarillo to move computers. Contractor shall be responsible for removal of old carpet and cove base, along with all other trash and debris Contractor is responsible for all measurements Contractor shall be responsible for all necessary preparation and repairs to floor for proper installation of carpeting and all trades associated with installation. There shall be a minimum of 15% of product for attic stock to include carpeting and LVT. Scope - This work shall include all labor, materials, equipment, and all services necessary to complete installation. 3. Cove base shall be removed and reinstalled with new cove base. Any damage while removing or installing cove base shall be repaired by contractor at no extra cost to the City of Amarillo. 6. All seams shall be cut in accordance with manufacturer's recommendation, using proper tools. 4. Floors must be dry, clean, and free of oil, grease, paint, ect, that would interfere with future condition of carpeting or treads. 7. Seams shall be pressed together with a suitable tool to produce the best possible even top pile width-to-width, seams shall be rolled with a 100-pound roller. 5. Contractor will install carpet flush to all stationary shelving units and under bottom shelves at least 4", shelf must maintain same functionality. 1. Contractor shall remove and install carpeting and LVT during regular working hours and shall coordinate with the ODR. 2. Contractor shall remove all carpet, pad, glue, tack strips and all other debris from site.

Sub-Bidding

Library

$50,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
0
Bidding Soon
100
All Active Projects
41
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 3, 2025

February 3, 2025

img_map_placeholder

1504 NE 24th Ave, Amarillo, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.