Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 27, 2025 at 7:00 PM
Updated February 28, 2025
Renovation of a mixed-use development in Milton, Pennsylvania. Completed plans call for the renovation of a educational facility.
**As of February 27,2025 project was awarded to Bobby Cross Painting LLC, awarded amount is $99,977,** Milton Area School District (MASD) is issuing two RFPs for painting: 1) Interior walls and bathrooms, and 2) Gymnasium interior at Milton Senior High School, 700 Mahoning St., Milton, PA 17847 For questions, contact Jeff Hoffman at jhoffman@miltonsd.org. Reference RFP: MASD HS Interior Painting, 1st Floor and/or MASD HS Gym Painting. The Milton Area School District intends to repaint the interior walls of the gymnasium located at the Milton Area High School. The requirements below are the basis for the refurbishment. The refurbishment shall use only high quality, first class materials. Interior and Exterior Painting Specifications: a. Paint: This category includes coating systems materials, primers, emulsions, enamels, stains, sealers and fillers, and other applied materials whether used as prime, intermediate or finish coats. b. Product Data: The Contractor shall submit manufacturer's technical information, label analysis, and application instructions to the Director of facilities for each paint material proposed for use, prior to starting work. The Contractor shall list each material and cross-reference specific coating and finish system and application as an attachment to the above submittal. The Contractor shall identify each material by the manufacturer's catalog number and general classification. c. Single Source Responsibility: The Contractor shall provide primers and undercoat paint produced by the same manufacturer as the finish coats. d. Material Quality: The Contractor shall provide the manufacturer's best quality trade sale type paint material. Paint material containers not displaying manufacturer's product identification are not acceptable. e. Material Delivery: The Contractor shall deliver materials to the job site in manufacturer's original, unopened packages and the containers shall bear the manufacturer's name and label with trade name and manufacturer's instructions. f. Material Storage: The Contractor shall store materials not in use in tightly covered containers in a well ventilated area at a minimum ambient temperature of 45 degrees F (7 degrees C). The Contractor shall protect materials from freezing and keep storage area neat and orderly. Contractor shall remove oily rags and waste daily. g. Project Conditions: The Contractor shall not apply paint when the relative humidity exceeds 85 percent, or at temperatures less than 5 degrees F (3 degrees C) above the dew point, or to damp or wet surfaces. The Contractor shall apply paint only in temperatures that comply with the manufacturer's specifications. h. Preliminary Examination: The Contractor shall examine substrates and conditions under which painting will be performed for compliance with requirements and shall not begin application until unsatisfactory conditions have been corrected.
Award
Educational
$99,977.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 6, 2025
June 2, 2025
700 Mahoning St, Milton, PA
Related To This Project
Milton, PA
Bid Date: Mar 20 2025
Milton, PA
Bid Date: Apr 02 2025
Milton, PA
Bid Date: May 02 2025
Milton, PA
Bid Date: Apr 23 2025
Milton, PA
Bid Date: May 05 2025
Milton, PA
Bid Date: Jun 11 2025
Milton, PA
--
Milton, PA
Bid Date: Aug 11 2025
Milton, PA
Bid Date: Nov 12 2024
Milton, PA
Bid Date: Nov 26 2024
Milton, PA
Bid Date: Nov 13 2024
Milton, PA
Bid Date: Oct 15 2024
Milton, PA
Bid Date: Aug 15 2024
Milton, PA
Bid Date: Jul 10 2024
Milton, PA
Bid Date: Jul 01 2024
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
