EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 11, 2025 at 8:00 PM

Updated June 14, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Harrisburg, Illinois. Completed plans call for site work for a bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; and for paving for a bridge / tunnel.

Replacement of 3 structures: 1) SN 083-7000 carrying IL 34 over a creek 1.5 miles east of Franklin County; 2) SN 083-7001 carrying IL 34 over a creek 2.4 miles east of Franklin County; 3) SN 083-7022 carrying IL 145/34 over a creek 3.2 miles south of US 45. Region 5 District 9 Federal Project # N/A County(s): Saline Key Route(s) : FAP 132, FAP 869 Marked Route(s) : IL 145,IL 34 Section(s) : 1CR-1;103CR-1;103CR-2 State Job #(s) : C-99-023-14 PPS #(s) : 9-00328-0000, 9-00866-0000, 9-00867-0000 DBE % 2.00 VBP% 0.00 Contract Specifics 60 Working Days Questions not accepted as of June 03, 2025 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, May 23, 2025. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 134 - Replacement of 3 Structures LOCATION OF PROJECT This project is located at: o SN 083-7000 (New SN 083-7107) carrying IL 34 over a creek 1.5 miles east of Franklin County o SN 083-7001 (New SN 083-7108) carrying IL 34 over a creek 2.4 miles east of Franklin County o SN 083-7022 carrying IL 145/34 over a creek 3.2 miles south of US 45 DESCRIPTION OF PROJECT The project consists of box culvert removal and replacements of SN 083-7000, SN 083-7001 and SN 083-7022. All the culverts will be replaced with precast concrete box culverts during a weekend closure. SN 083-7107 and SN 083-7108 have precast concrete apron end sections. SN 083-7022 has a cast-in-place concrete drop structure and a precast concrete end section. One lane of traffic on IL 145/34 will be maintained over SN 083-7022 during the construction of its end section and drop structure. Major items to be constructed for this project include porous granular embankment, concrete box culvert, and stone riprap. Roadway improvements include the construction of concrete pavement, concrete shoulders, pavement marking, earthwork, and seeding.

Post-Bid

Bridges / Tunnels

$250,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

61

8

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Fill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
17
Bidding Soon
381
All Active Projects
134
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2025

July 14, 2025

img_map_placeholder

Multiple Locations, Harrisburg, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.