BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in East Fayetteville, North Carolina. Completed plans call for the renovation of a detention facility.

Restroom Renovation of Cumberland County Law Enforcement Center Phase 1 & 2 The Contractor and/or subcontractors shall furnish Certificate of Liability Insurance upon request and keep in force the insurance requirements for a period of one (1) year after completion and acceptance of the work by the Owner. The certificate is to make reference to the project and the Owner. Question Deadline 12/16/2024 All questions shall be submitted in writing to sunderwood@cumberlandcountync.gov This will provide ample time to issue an addendum for this project if necessary. Vendor is cautioned that any information released to attendees during the site visit, other than that involving the physical aspects of the facility referenced above, and which conflicts with, supersedes, or adds to requirements in this invitation for bid, must be confirmed by written addendum before it can be considered to be a part of this proposal. Bidder shall identify on the bid, the minority businesses that will be utilized on the project with corresponding total dollar value of the bid and affidavit listing good faith efforts or an affidavit indicating work under Contract will be self-performed, as required by G.S. 143- 128.2(c) and G.S. 143-128.2(f). Failure to comply with these requirements is grounds for rejection of the bid. Performance and Payment Bonds ARE required. All Contractors are notified that North Carolina Statutory provisions as to licensing for Contractors will be observed in receiving, reading, and awarding of contracts. All bidders that submit a proposal for this project must be a North Carolina Licensed General Contractor. The County reserves the right to reject any or all proposals. The bidder to whom the contract may be awarded must comply with the requirements of G.S. Section 143-131, as amended. No bids may be withdrawn after the scheduled closing time for the receipt of proposals for a period of forty-five (45) days. The Contractor shall furnish Certificate of Liability Insurance upon request. If requested the contractor shall obtain all insurance required below and submitted to the Owner in the form of a Certificate of Liability Insurance naming the County of Cumberland, P.O. Box 1829, Fayetteville, NC 28302 as the certificate holder, and such insurance has been approved by the Owner; nor shall the Contractor allow any subcontractor to commence work until such insurance has been obtained and approved. If a subcontractor does not take out insurance in his own name and his principal Contractor wishes to provide insurance protection for such subcontractor and such subcontractor's employees, a rider must be attached to the principal policy, the Contractor must take out appropriate policies in the name of the subcontractor. Vendors with concerns regarding insurance requirements must submit questions prior to the bid due date. Vendors may propose alternative insurance requirements. Acceptance of any insurance requirement changes will be at the discretion of the County and must be pre-authorized by the County's Risk Management Coordinator. The CONTRACTOR shall provide a 12-month warranty on all materials and workmanship beginning on the date of final acceptance.

Post-Bid

Jails / Prisons

$300,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
34
Bidding Soon
1,227
All Active Projects
484
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2024

January 20, 2025

img_map_placeholder

131 Dick St, East Fayetteville, NC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.