BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Southgate, Michigan. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Reference Number : 0000370222 The proposed project is for the parking and ADA improvements at the Southgate City Hall. The project consists of soil erosion control measures, removing existing pavement, masonry walls, concrete steps, trees, landscaping and other miscellaneous items. The project will also include earth excavation, storm sewer, drainage structure work, embankment, approximately 2550 square yards of new concrete pavement, approximately 460 square yards of new asphalt pavement, concrete curb and gutter, approximately 6300 square feet of sidewalk and ADA ramps, pavement markings, decorative retaining wall and a depository (drop) box. The project anticipated start date is February 10, 2025 and shall be substantially completed by June 13, 2025. Question Deadline 12/26/2024 at 12:00 PM ET, Questions are submitted online : No All questions shall be directed to John M. Miller, Project/Construction Manager by email at jmmiller@hengineers.com. All questions must be submitted five (5) business days prior to bid date. Bidders must deposit, with their bid, surety in the form of a certified check, bank draft, or bid bond, in the sum of five percent (5%) of the amount of the proposal. The OWNER reserves the right to waive any information or to reject any and/or all bids. Bidders may not withdraw their bid within 90 days after the date of bid opened. The CONTRACTOR shall furnish the ENGINEER with an Audio/Video Route Survey record ofthe existing conditions prior to the start of construction. The CONTRACTOR must enlist the services of personnel having a minimum of one- (1) year experience in audio/video taping of construction projects. Complete coverage shall include all surface features located within the public right-of-way, easement areas and adjacent private properties up to building line when such properties lie within the zone of influence of construction and will be supported by appropriate audio descriptions made simultaneously with video coverage. Such coverage shall include, but not limited to, all existing driveways, sidewalks, curbs, ditches, roadways, landscaping, trees, culverts, head walls and retaining walls or buildings located within such zones ofinfluence. When conventional wheeled vehicles are used, the distance from the camera lens to the ground shall be not less than 10 feet to ensure proper perspective. Audio/video tapes are to be on DVDs suitable for recording and playback on computer or standard DVD equipment. Houses and buildings shall be identified visually by house number, when visible, in such a manner that structures of the proposed system can be located by reference. In all instances, however, location shall be identified by audio or visual means at intervals not to exceed 100 linear feet in the general direction of travel. The rate of speed in the general direction of travel of the conveyance used during taping shall not exceed 30 feet/minute. Panning rates and zoom-in/zoom-out rates shall be controlled sufficiently such that stop action during the playback will produce clarity of detail of the object viewed. All taping shall be done during times of good visibility. No taping shall be done during periods of visible precipitation or when more than 10 percent of the ground area is covered with snow or standing water, unless otherwise authorized by the OWNER. Any taped coverage not acceptable to OWNER shall be re-filmed at any additional charge. The OWNER shall have the authority to designate areas for which coverage may be added or omitted. All tapes shall be properly identified as to location, time and date in a manner acceptable to the OWNER. The audio/video taping shall be done prior to the start of any construction removals and furnished one week prior to starting construction. To preclude the possibility of tampering or editing to any manner, all video recordings must, by electronic means, display continuously and simultaneously generated transparent digital information to include the date and time of recording, as well as the corresponding ENGINEER stationing numbers and street names. The date information will contain the month, day, and year; for example, 1/13/08, and be placed directly below the time information. The time information shall consist of hours, minutes, and seconds separated by colons; for example, 10:35:18. This transparent information will appear on the extreme upper left-hand or right-hand third of the screen.

Sub-Bidding

Sidewalks / Parking Lot

$400,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
76
Bidding Soon
1,460
All Active Projects
582
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 2, 2025

February 10, 2025

img_map_placeholder

14400 Dix Toledo Rd, Southgate, MI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.