BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 10, 2024 at 7:00 PM

Updated January 1, 2025

This is a service / maintenance or supply contract in Milan, Missouri. Contact the soliciting agency for additional information.

The construction of full-depth reclamation (FDR) of multiple local routes with alternates of asphalt overlay and levelling course. The routes will be evaluated in multiple segments and final awards will be per NCMRWC IDIQ processes and final IDIQ negotiations. Segments include 20,600 L.F. of existing former Route N MoDOT blacktop and 8,000 L.F. of existing former Route VV MoDOT blacktop as highest priority. Additional local road segments include FDR on existing, newly built gravel construction access roads where new roadway subgrades are constructed with variable gravel tops, including Mid-Lake Road from Highway 5 to Route VV western terminus, Mayapple East from Route RA/Finch terminus to Route Y/N intersection, Marina Road from England to a terminus, East Public Access Area from Mid-Lake to a terminus, and West Public Access Area from Mid-Lake to a terminus. Final awards to the IDIQ contractors will vary and depend on final prices and final negotiations of on-site benefits to the NCMRWC. The total FDR planned for Task Order 2025.01 is 105,000 square yards (+/-) and the total FDR planned for Task Order 2025.02 is 94,000 square yards (+/-). The NCMRWC is working in cooperation with their pre-qualified Indefinite Delivery / Indefinite Quantity (IDIQ) contractors to procure specialty roadway and subgrade services to complete an existing ongoing roadway project. Bids will be received by the IDIQ contractors as the general contractor and reviewed in compliance with the IDIQ acquisition process. Liquidated damages per day: $500.00 Completion Date: May 15,2025 September 15,2025 The existing approved prime (general) contractors are bound under existing IDIQ agreements and selection procedures by the NCMRWC. They are as follows: Better By Design Linhart Construction Lois Rodriguez, Owner Shane Linhart, Owner 900 West Helm Street 25995 General Drive Brookfield, MO 64628 Milan, MO 63556 (660) 734-0472 (660) 265-4770 lrodriguez@betterbydesignllc.com linhartshane70@gmail.com

Post-Bid

Roads / Highways

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
41
Bidding Soon
360
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 31, 2024

January 30, 2025

Project location map

Multiple Locations, Milan, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.