Site work for a civil project in Whitmire, South Carolina. Completed plans call for site work for a water / sewer project.

Division I includes the installation of approximately 850 LF of 4-inch DIP water mains with roadway bores, and all appurtenances; Division II includes the refurbishment of two Clarifiers at the town's WWTP. Questions should be emailed to Marcus Cason at mcason@summitengineeringgroup.com at least seven days prior to bid opening. Question Deadline 01/10/2025 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All bidders must order Plans and Specifications directly from Summit Engineering Group Inc. In order to bid on the project you must be added the Plan Holders list to ensure all addendums are received. The project will generally require the following work activities: o Installation of water mains and appurtenances. o Refurbishment of two WWTP Clarifiers. o Site restoration activities. o Other associated appurtenances for a complete and proper installation. B. General Information: 1. All work will be confined to the existing road rights of way, waterline easements, and on Town of Whitmire property and the Contractor shall take great care to ensure that all areas affected by construction activities are returned to original or better conditions. 2. Safety of area residents, construction personnel, and others associated with the project shall be given high priority at all times. 3. Strict adherence to daily clean-up requirements shall be expected of Contractor personnel, subcontractors, etc. Construction activities may be halted by the Engineer or the Owner should Contractor personnel, subcontractors, etc. fail to adhere to this requirement. No additional payment for such stoppage will be granted by the Owner. 4. Existing utilities damaged during construction shall be immediately repaired and placed back into service. The Contractor is cautioned that all backfill shall meet "minimum" compaction requirement as stated in the specifications. Select backfill material, if required, shall be included in the unit price of the item to which it pertains. No additional payment shall be granted for select backfill material, regardless of the quantity required

Post-Bid

Water / Sewer

$900,000.00

Public - State/Provincial

Site Work

14

13

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
265
Active Projects
96
Bidding Soon
1,749
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 16, 2025

February 17, 2025

Project location map

Multiple Locations, Whitmire, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.