BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a road / highway in Whitmire, South Carolina. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Award Details Contract Award Date: Feb 08, 2022 Contract Award Number: 12445222C0002 Task/Delivery Order Number: Contractor Awarded Unique Entity ID (DUNS): 143198823 Contractor Awarded Unique Entity ID (SAM): TCTAMMLJAFN3 Contractor Awarded Name: BENCHMARK TRAILS, INC Contractor Awarded Address: Greenville, SC 29607-1360 USA Base and All Options Value (Total Contract Value): $86770.00 FATS Skinny Trail Maintenance 6.6 miles trail. Francis Marion & Sumter National Forest Office, Edgefield County, South Carolina. See Sections L and M in the Solicitation 12445222Q0001 Attachment for information on responding to this request for quote. Magnitude of construction cost $ 25,000 and $ 100,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Location- The Francis Marion and Sumter National Forest Office, located in Edgefield County, South Carolina. MBE (30.7%), WBE (6.9%) The work includes heavy, moderate, and light maintenance activities as described below: Heavy maintenance consists of using machines, such as a mini-excavator, to install earthen water diversion structures. These structures consist of rolling grade dips and knicks (grade dips), used to divert water off existing trails to reduce erosion. The structures are constructed with native soil harvested using borrow pits within the 10 foot-wide trailway. Seeps and other wet areas of the tread will be surfaced with crushed slate or rock armored using the pitched stone method. Some problem locations will be repairedwith a trail realignment, within the exiting trail prism. Two trail reroutes are also required, outside the trail prism. Abandoned trail segments will require obliteration. Wood decking is to be replaced on two small bridges

Award

Roads / Highways

$86,770.00

Public - Federal

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
65
Bidding Soon
1,148
All Active Projects
566
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2022

February 18, 2022

img_map_placeholder

20 Work Center Rd, Whitmire, SC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.