Published October 7, 2026 at 8:00 PM

Updated October 13, 2026

Site work for a civil project in La Grande, Oregon. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

Drainage, Signing, and Roadside Development 1-84: Eastern Oregon Culvert Repair Phase 2 Project Old Oregon Trail Highway Union & Baker Counties Region 2 I-84: Eastern Oregon Culvert Repair Phase 2 Old Oregon Trail Bryan Strasser, Re I-84: Eastern Oregon Culvert Repair Phase 2 Project on the Old Oregon Trail Highway beginning in La Grande. FAP No. S006(184). ($ 2,000,000 - $ 5,000,000). Req. approx. 1,800 ft2 temp signs; 4 ea seq. arr. signs; 4 ea PCMS; 4 ea rad. spd. trlr.; 180 hr flag.; 300 ft temp barr.; 4 ea TMA; 2 ea temp. water manag. Fac.; 580 ft temp. fence; 120 ft sed. barr.; 36 tn cont. soil; lead comp. plan; bulk asbestos samp.; const surv work; rem. of grdl.; 60 yd3 loose riprap; 5,877 ft rehib. Pipe; 11,754 ft vid. insp.; 103 culv. pipe; 181 ft2 pvd. culv. end slp.; 1 ea conc. inlet; 1 ea adj. inlet; 1 ea fill aban. struc.; 42 yd2 trench resur.; 10 ea culvert pnt. rep.; 25 ft grdl.; 125 ea culv. drain. mark.; 0.2 ac seed.; 340 ft rem. & rebu. fence. Class of Work: Earthwork and Drainage. The policy of the Oregon Department of Transportation is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State laws, rules and regulations. The Department of Transportation may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the Department of Transportation that it is in the public interest to do so. To be eligible for award of Oregon Department of Transportation construction contracts, bidders (prime contractors) must submit a prequalification application according to ODOT's Oregon Administrative Rules and prequalification procedures at least ten calendar days before the Bid Closing date. Prequalification must be in the class(es) of work indicated in the project's special provisions, and the bid booklet. ORDOT - 002 - I-84: Eastern Oregon Culvert Repair Phase 3 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Project Description The Project is comprised of 32 culverts at which work is anticipated to be performed, along with four additional culverts that have been identified as substitute culverts should an issue arise during the design process that requires removal of one of the original 32 culverts from the Project. A map showing the culvert locations is provided in Appendix A. Key details about each of the 36 culvert locations are presented in Table B- 1 in Appendix B. A bituminous coating is present on culvert pipes at 27 of the 36 culvert locations based on images viewed in the ODOT Drainage Facilities Maintenance System (DFMS) database. The planned work at these 27 culvert locations is summarized below: 1. MP 254.42 - Cured-in-place pipe (CIPP) liner; outlet riprap 2. MP 254.62 - Outlet end replacement/riprap 3. MP 254.98 - CIPP liner; outlet riprap 4. MP 255.48 - CIPP liner; outlet end replacement 5. MP 255.65 - CIPP liner; outlet end replacement 6. MP 267.29 - CIPP liner 7. MP 267.30 - CIPP liner 8. MP 268.70 - CIPP liner 9. MP 270.25 - CIPP liner; point repair; adjust inlet; outlet riprap 10. MP 270.99 - CIPP liner 11. MP 271.07 - CIPP liner 12. MP 272.33 - CIPP liner 13. MP 272.331 - CIPP liner 14. MP 272.78 - CIPP liner; point repair 15. MP 274.89 - CIPP liner 16. MP 274.92 - CIPP liner 17. MP 275.15 - Outlet end replacement 18. MP 275.54 - CIPP liner; point repair 19. MP 276.58 - CIPP liner 20. MP 276.581 - CIPP liner21. MP 276.76 - Outlet riprap 22. MP 276.83 - CIPP liner 23. MP 279.50 - CIPP liner; outlet end replacement24. MP 282.69 - CIPP liner 25. MP 286.45 - CIPP liner; outlet riprap 26. MP 290.01 - CIPP liner 27. MP 291.78 - CIPP liner Disturbance of the bituminous coating during repair activities has the potential to release asbestos fibers if the bituminous coating contains asbestos.

GC Bidding

Bridges / Tunnels

$5,000,000.00

Public - State/Provincial

Site Work

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
21
Bidding Soon
285
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2026

December 14, 2026

Project location map

I-84, La Grande, OR

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed