Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 13, 2025 at 8:00 PM
Updated June 14, 2025
Site work and paving for a mixed-use development in La Grande, Oregon. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
Region 5 PE EA PE003437 CON EA CON04832 North Powder/Richland/Halfway Curb Ramps Project on Various Highways in North Powder, Richland, & Halfway. Fap No. Sa00(805). Estimated Value : ($ 5,000,000 - $ 10,000,000). Req. Approx. 2,635 Ft2 Temp. Signs; 3 Ea. Pcms; 3,840 Hr Flaggers; 1,540 Ft Ped. Chan. Dev.; 5 Ea. Decom. Reg. Ust; 4 Ea. Decom. Heating Oil Tanks; 1,278 Ton Contam. Soil Disp.; 2,000 Gal. Contam. Groundwater Rem.; Seg. & Stockpile Contam. Soil; Const. Surv. Work; 6,369 Yd2 Rem. Of Surf. For Curb Ramp Const.; 5,927 Ft Asph. Pvmt. Sawcutting; 218 Ft Storm Sewer Pipe; 140 Ft. Di Pipe; 3 Ea. Conc. Mh; 39 Ea. Conc. Inlets; 26 Ea. Adj. Boxes; 37 Ea. Conn. To Extg. Str.; 16 Ea. Adj. Inlets; 5 Ea. Adj. Mh; 3,077 Ton Aggr. Base; 692 Ton Acp; 4,807 Ft. Conc. Curb; 425 Ft2 Conc. Drvwy.; 33,075 Ft2 Conc. Walks; 148 Ea. Curb Ramps; 1,794 Ft2 Trunc. Domes; 1,978 Ft Paint Pvmt. Mark.; 1,693 Ft2 Pvmt. Bar; 3.4 Yd3 Sign Supp. Ftg.; 1,720 Lb Psst Sign Supp.; 591 Ft2 Signs; Pole Foundations; Refurb. & Reinstall Extg. Illumin. Syst.; 12 Yd3 Rock Mulch; Rem. & Rebuild Fence; 2 Ea. Hydrant Extensions. Completion Time: September 30, 2026. Classes of Work: Either: a) Earthwork and Drainage, or B) Miscellaneous Highway Appurtenances. This Project Contains Fuel Escalation Clause. This Project Contains a 5% Dbe Goal. This Project Contains a 10% Indian Employment Preference Goal. The Oregon Department of Transportation is an Equal Employment Opportunity and Affirmative Action Employer. The policy of the Oregon Department of Transportation is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State laws, rules and regulations. The Department of Transportation may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the Department of Transportation that it is in the public interest to do so. For Bids submitted by hand delivery, date stamp the Bid with the provided date stamping device and place into the ODOT Procurement Bid Box located in the 1st floor lobby at the following address: Oregon Department of Transportation 355 Capitol Street NE, Salem, Oregon 97301 OR DOT - 002 - North Powder/Richland/Halfway Curb Ramps Project on Various Highways *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Sidewalks / Parking Lot
$3,503,691.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
