Demolition, site work, paving, new construction and addition to a mixed-use development in Dallas Center, Iowa. Completed plans call for the addition of a municipal facility; for the demolition of a municipal facility; for the construction of a 8,962-square-foot, one-story above grade municipal facility; for site work for a municipal facility; sidewalk / parking lot; for paving for a sidewalk / parking lot; 6,110-square-foot, one-story above grade parking garage; parking garage; and water / sewer project.

Construction of Dallas County Secondary Roads Admin Addition in Dallas Center, Iowa. the Project Consists of Site Improvements, Demolition of the Existing Admin Building, Construction of a New 8,962 Square Foot Single Story Admin Building, and Construction of a New 6,110 Square Foot Single Story Garage. the Project is Located at: 23380 250 Th St. Dallas Center, IA BP 03.01 Building / Structural Concrete - This package includes, but is not limited to, concrete footings, foundations, column piers, slab on grade, stoops, equipment pads and sealed concrete. BP 04.01 Masonry - This package includes, but not limited to, unit masonry assemblies. BP 05.01 Structural Steel & Miscellaneous Metals - This package includes supply and erections of structural steel and miscellaneous metals. BP 06.01 General Trades - This package includes, but is not limited to, supply and installation of rough carpentry materials and installation of finish carpentry; architectural wood casework; roof specialties; doors, frames, and hardware; visual display units and cases; plaques and signage; toilet compartments and accessories; fire extinguishers and cabinets; lockers; flagpoles; and countertops. BP 07.01 Roofing / Sheet Metal - This package includes, but is not limited to, a complete membrane roofing system with sheet metal flashing. BP 08.01 Glass & Glazing - This package includes, but not limited to, aluminum storefront and interior glazing. BP 09.01 Metal Framing / Drywall / Ceilings - This package includes, but is not limited to, interior and exterior metal stud wall assemblies and acoustical ceilings. BP 13.01 PEMB - This package includes, but not limited to, supply and installation of a preengineered metal building. BP 22.01 Plumbing and Mechanical - This package includes complete plumbing and mechanical systems. BP 23.01 Geothermal - This package includes a complete geothermal system. BP 26.01 Electrical - This package includes complete electrical, data / telecommunications, audio visual, security, and fire alarm systems. BP 31.01 Site Demolition, Earthwork & Utilities - This package includes, but is not limited to, site demolition, grading, and site utilities. BP 32.01 Site Concrete - This package includes, but is not limited to, site concrete, joint sealant, pavement markings, and parking lot appurtenances. Question Deadline 12/19/2024 at 12:00 PM CT Any/all questions are to be submitted electronically. Questions can be submitted at any time but must be submitted. The Construction Manager and/or Owner will review, and score submitted Preapproval Forms based upon an objective scoring process and statutory criteria. Submissions meeting or exceeding minimum scoring criteria shall be deemed as an approved bidder for the project. The Construction Manager and/or Owner retain the right to reject any/all submission documents if documentation is deemed flawed, incomplete, or insufficient to properly score.

GC Bidding

Municipal

$3,000,000.00

Public - County

Addition, Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
31
Bidding Soon
548
All Active Projects
221
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 3, 2025

February 3, 2025

img_map_placeholder

23380 250th St, Dallas Center, IA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.