Site work for a swimming pool in Naples, Florida. Completed plans call for site work for a swimming pool.

Collier County for the construction of the Sun-n-Fun Lagoon Plunge Pool Renovation located in Collier County, Florida Contractor Requirements for all BCC Construction Projects 1. Contractors will be required to understand and comply with all applicable laws and regulations of any governmental entity (OSHA, DOT, EPA, DHS, ANSI, FDEP. NFPA, etc.) and Collier County CMA's, EHS Standard Operating Procedures (SOP's) or Job Safety Analysis (JSA's) that that pertain to environmental, health and safety standards and/or work practices applicable to the activities they perform for Collier County. These include but are not limited to: o Must wear a BCC provided Vendor Badge at all times while on BCC property. o Powered Industrial Vehicle Certifications (Heavy Equipment, Cranes, etc.) o Storage, handling, and use of flammable liquids and hazardous materials, including fuels and compressed gas cylinders. o Daily reporting of any incidents/accidents or any OSHA safety inspections of equipment and worksites. o Weekly reporting of at least one internal safety inspection of equipment and worksite. o Use of Personal Fall Protection Devices while working at heights above 6 feet. o Following Electrical Safety Practices, Arc Flash and Lockout/Tagout procedures. o Proper use of Personal Protective Equipment. (PPE) o Proper maintenance and use of ladders and other equipment. o Guarding of wall and floor openings, open trenches, and excavations. o Environmental Requirements (Permitting, Tanks, etc.) 2. Required Site EHS Plans for: o Site Specific Safety Plan o Site Specific Security Plan o Site Specific Hurricane Plan o Site Specific Pandemic Safety Plan (COVID-19) (If Applicable) o Site Specific Respirable Crystalline Silica Plan (If Applicable) o Site Specific Confined Space Entry Plan (If Applicable) o Site Specific Asbestos Management Plan (If Applicable) o Site Specific Mold Testing and Remediation Management Plan (If Applicable) E_ o Site Specific Environmental Protection Plan (Spill Cleanup, SPCC, etc.) (If Applicable) 3. When working within a right-of-way (i.e. roads, sidewalks, bike paths, etc) - All applicable FDOT and/or MUTCD requirements are to be followed at all times. Specifics include but are not limited to: o ANSI/ISEA 107-2010 Compliant Class 2 or 3 Hi-Visibility Safety Garments. o Applicable work zone signage, cones, barricades or barrels, arrow panels, flagging personnel and Stop/Slow Paddles, where necessary, required by law or the BCC. o An applicable work zone (Maintenance of traffic) plan based on FDOT and/or MUTCD designs on site. 4. Risk Management is included in all Pre-Activity/Construction, Activity/Construction and Post Activity/Construction Meetings. 5. Safeguarding construction sites - Protecting the jobsite and preventing or inhibiting public access after activities are finished for the day is equally important. Therefore, all hazardous locations within construction sites and rights-of-ways are to be adequately protected. Specifics include but are not limited to: o Damaged, blocked, or missing sections of sidewalks, bike paths or other pedestrian access zones shall be protected with orange barricade fencing, barricades with yellow or red tape (depending on the hazard) or an equivalent means of protection. Sidewalks must also be posted as being closed on both sides with a white sign with black letters. o Excavations must be protected in a similar manner as listed above if they must be left open overnight, during weekend hours, etc. o All other hazards shall be evaluated by the contractor to ensure there are no dangerous conditions remaining that could be inadvertently encountered by collier county employees and/or the public while the construction site is not active (i.e., when no construction work is taking place). 6. Contractor must agree that all work must meet or exceed the standards set forth in the Collier County Vertical Construction Standards and Collier County IT Construction Standards (if applicable) unless specifically exempted in writing by Facilities Management Division Director and Risk Management Director. Question Submission Deadline:January 17, 2025, 5:00pm Base Bid: The base bid includes removal and replacement of the three (3) main drains in the Plunge Pool. Existing main drains are to be removed and replaced with manufactured drains compliant with current VGB standards. The pool floo r will need to be demolished in the area of the drain replacement, with new floor and pool finis h installed. This will also require the demo and replacement of some inlets and inlet piping. Dr ain piping shall be reconnected to the existing piping, per the plans. Bidding contractors must reference the Pool (PL) drawings and specifications for the entire scope of work, including items not mentioned in this narrative. Please reach out to the County for any clarifications on the bidding process and tim eline.

GC Bidding

Swimming Pools

$151,000.00

Public - County

Site Work

9

9

3

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
26
Bidding Soon
262
All Active Projects
102
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 24, 2025

February 24, 2025

img_map_placeholder

15000 Livingston Rd, Naples, FL

New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.