BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 17, 2025 at 7:00 PM

Updated November 18, 2025

Site work and paving for a sidewalk / parking lot in Louisville, Kentucky. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of November 17, 2025, project awarded. County - Jefferson Route - US-31E Item No. - 5-80259.00 Project Description - Right sizing and pedestrian access improvements on US-31E from MP 14.625 (Eastern Parkway) to MP 13.125 (Taylorsville Road) Project Manager - Kyle Danhauer User Division - Highway Design Approximate Fee - $175,000 Preliminary Engineering & Environmental Services (Lump Sum) Project Funding - SPP Funds (State Funds) Project Length - Approximately 1.50 miles The purpose of this project is to increase the safety for vulnerable road users along US-31E (Bardstown Road) from KY-155 (Taylorsville Road) to US-60A (Eastern Parkway) in Jefferson County. The Bardstown Road corridor is a multi-lane roadway which serves as a principal urban arterial for the commercial areas in the historic Highlands neighborhood of Louisville. US-31E provides a primary connection from downtown Louisville to the Watterson Expressway. The corridor was described in The Bardstown Road Safety Study (2018) as having one of the highest concentrations of pedestrian strikes in Louisville. The limits of this project include the southern portion of Section 1 and all of Section 2 in that study. From 2019-2023 the corridor generated 240.25 Excess Expected Crashes (EEC) for the segment between Taylorsville Road and Bonnycastle Avenue, and 56.31 EEC for the segment between Bonnycastle Avenue and Eastern Parkway. The Consultant team may include a DBE Participation Plan with their Response to Announcement to help the Department meet the 11.95% DBE goal established by FHWA. First Selection Meeting: January 13, 2025 Final Selection: January 29, 2025 Pre-Design Conference: February 5, 2025 Consultant Fee Proposal: February 14, 2025 Contract Negotiations: February 26, 2025 Notice to Proceed: March 19, 2025 The method of contractor selection has not been determined at this time. KY DOT - RFP Engineering - Right Sizing and Pedestrian Access Improvements on US-31E

Award

Sidewalks / Parking Lot

$175,000.00

Public - State/Provincial

Paving, Site Work

41

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
204
Active Projects
108
Bidding Soon
1,639
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 8, 2026

Project location map

US-31E, Louisville, KY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.