BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 6, 2025 at 7:00 PM

Updated February 7, 2025

Site work for a water / sewer project in Vancouver, Washington. Completed plans call for site work for a water / sewer project.

Scope of work is indicated on the contract drawings and specifications. It includes a restricted date range to replace an existing sanitary sewer line outside the Baird Administration Building on the Clark College main campus in Vancouver, Washington. The existing sanitary sewer line may be asbestos concrete pipe. See Section 01 1101 Summary of Hazardous Materials Work, Drawing C100, and Section 01 2300 Alternates. Additive Alternate Bid Item #1 - Remove and replace sanitary sewer and concrete between Locations A and B. Additive Alternate Bid Item #2 - Abate and dispose of asbestos cement sanitary piping. Clark College Baird Sewer Replacement Question Deadline 01/02/2025 at 1:00 PM PT Questions Online Portal Please direct questions regarding this project to the Office of the Consultant, Robertson Fick Engineering PC, Chris Robertson, (360) 831-0066, chris@robertsonfick.com Estimated Base Bi D Cost Range: $80,000.00 to $115,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. bid open notes : https://teams.microsoft.com/l/meetup-join/19%3ameeting_N2JjZDU0NGUtZmM3NC00OTlhLWE2NWQtOTViYzNiMjg1OTk0%40thread.v2/0context=%7b%22Tid%22%3a%2211d0e217-264e-400a-8ba0-57dcc127d72d%22%2c%22Oid%22%3a%228276b297-0ea1-4aca-beed-94bf985ec531%22%7d Meeting ID: 232 943 171 100 Passcode: WPJKXj Or call in (audio only) +1 564-999-2000,,994059963# United States, Olympia (833) 322-1218,,994059963# United States (Toll-free) Phone Conference ID: 994 059 963# Voluntary numerical Diverse Business goals of 10% MBE, 6% WBE, 5% Washington Small Business, and 5% Veterans have been established for this project. Achievement of the goals is encouraged. The undersigned agrees to pay the Owner as liquidated damages the sum of $200.00 for each consecutive calendar day that is in default after the Contract Time. Liquidated damages shall be deducted from the contract invoice after taxes and retainage. Contract Time - The undersigned hereby agrees to Substantially Complete all the work under the Base Bid (and accepted Alternates) within 60 calendar days after the date of Notice to Proceed. Final Completion - All the Work shall be fully and finally completed in accordance with the contract documents within 45 calendar days after the date of Substantial Completion. The state reserves the right to accept or reject any or all bids and to waive informalities.

Award

Water / Sewer

$43,319.00

Public - State/Provincial

Site Work

5

14

2

5

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
87
Bidding Soon
915
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2025

February 10, 2025

Project location map

1933 Fort Vancouver Way, Vancouver, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.