BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Evans, Georgia. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

Details and budgets to be discussed at mandatory pre-bid meeting. Minimum Requirements: o Minimum Project Square Footage 1440 o Galvanized steel frame o 11 Gauge Posts to extend into the ground and set in concrete o Bows: 2" x 3" x 14 Gauge Rectangle - 6' Spacing o Trusses: 2" x 2" x 14 Gauge Rectangle o Purlins 1 3/8" Round o Ridge: Extruded Aluminum ridge cap o Roof Glazing: 8mm clear twin wall no drip polycarbonate panels. (10 yr. warranty) o Eave Glazing System: Aluminum extruded o Eave Glazing: 8mm clear twin wall no drip polycarbonate. (10 yr. warranty) o Engineering drawings for structural design o Engineering drawings for foundation design Front End Gable o Quantity two 36" exhaust fans and entry door o Framing studs 2" x 2" x 14-gauge square o Horizontal Purlins 2" x 2" x 14-gauge square o Base Extrusion Aluminum Rear End Gable o Framed for 4' x 15' Evaporative Cooling system and 1 entry door o Framing Studs: 2" x 2" x 14 gauge Square o Horizontal Purlins 2" x 2" x 14-gauge square o Base Extrusion Aluminum Ventilation o 36" Box exhaust fan 3/4hp: 11,410 cfm ea. @ .10 SP 110V or 220V. All fans are single speed & equipped with shutter and guard. Offering a minimum of 1.3 air exchanges per minute @ .10 inches of static pressure. o 39" Motorized Shutter, located above cooling pad offers a fresh air intake at the minimum stage cooling. Equipped with shutter motor o Quantity one 4' x 15' Stainless Steel Evaporative Cooling System with trough, plate and 6" thick pad. The 6" pad material offers maximum cooling. Uses a 65 / 15 degree water/air flow with a 420 per maximum face velocity. System is self contained and does not require a reservoir tank. Includes sump pump and float valve for proper water level regulation. o Quantity one 4' x 15' Automatic Wall Vent located behind the evaporative cooling system. Wall vent operates using a motorized rack & pinion drive system offering years of maintenance free operation. Includes 24 volt motor, mounts and vent boss. Includes extruded aluminum frame and 10 yr. warranted 8mm polycarbonate covering. Heating o Quantity one 200,000 BTU -L. P. Modine Gas heater or equivalent. Modine Model PTP200A Heater delivers 80% thermal efficiency in a small package. Featuring a aluminized primary heat exchanger. Totally enclosed fan motors and all controls mounted inside the cabinet for protection from airborne moisture and dust. Comes set-up for LP gas, Natural gas conversion available. o Quantity two Horizontal Air Flow Fans (HAF) 18" - 3 bladed fans complete with guard and a split capacitor 115 volt 60 hz motor, 1.1 amps develops 1790 CFM. These fans circulate the air to maintain a consistent temperature inside the greenhouse, in addition, these fans reduce the stratification (stale air) thus reduces the risk of plant disease. Doors o Quantity two - 36" x 7' -0" ADA compliant single swing door with 24" x 30" Tempered Glass Light Kit. Includes: 20 ga. Polystyrene Door leaf, 16 ga. 4-1/4" frame, bb hinges (3), threshold sweep, kerf weatherstrip, Sargent Rim Panic hardware, lever lockset and closer. Automatic Temperature Control o Quantity one Bartlett Instrument Company Climate Boss Controller or equivalent. Touch screen technology enables you to control either mechanically or naturally cooled greenhouses. This unit comes with pre-wired relay box for ease of installation. The Climate Boss can be programmed for 1 or 2 zones and allows for programmable temperature settings in Day, Night and DIF stages. Includes 2 cycle timers for irrigation misting, or lights: a vent stage for dehumidification: an alarm outpur for high or low temperatures for the past 7 days are available as graphs. WiFi Enabled Controller for Updates and HeadGrower app which allows remote control and programing. Hanging Basket Rails o Quantity one to Include: 6 runs of 1-3/8" x 17 gauge tubing running length of benches, 36' long rail length. Shade Cloth o Quantity one 34' x 47' (1598 Square Ft.) Svensson_Harmony (or equivalent) Shade Cloth with 51% Shading factor. Grommeted and taped 2 foot on centers. The shade cloth will be applied to the roof of the finished structure and to be attached to the midpoint on side wall for easy installation and removal. The shade cloth will help reduce inside temperature and allow optimum growing for "Partial Sun" plant material. Included is 3/4" - 1 hole clamp with hardware and Lace Rope for Shade Cloth attachment. Emergency Lighting / Exit Signs / Fire Extinguisher o Will be located above doors and will illuminate the word "EXIT" at all times, also has emergency lights powered by a rechargeable battery. Emergency lights should come on when the power is interrupted for any reason. One Multipurpose dry chemical A-B-C rated 10 lb. Fire extinguisher charged with formulated siliconized dry chemical UL rated for fighting paper, wood, fabric, grease, flammable liquid and electrical fires. Benches o Benches are framed with aluminum extrusions and rectangular galvanized steel tubing for superior strength. Bench mesh is 3/4" x 13 gauge galvanized expanded metal. Bench cross braces are made of 1" x 2" rectangular tubing and spaced 2 ft. apart, bench legs consist of 1" x 2" rectangular tubing. Qty. 8 - 6' x 9' - 6" Portable Benches Qty. 2 - 3' x 36' Continuous Benches Irrigation o Mist: Complete system with brass high pressure regulator, filter, punch tool, gate valves, zone controller, and solenoids. Mist irrigation plumbed above benches with 36" long misters spaced 4' on centers and will have manual shut off. Hanging basket drippers are to be fixed flow and have the capacity to be turned off. Drippers are spaced 24" on centers and 24" long. o Fertilizer Injector: Installed minimum of 30" ground for easy access, all irrigation outlets are serviced through fertilizer injector. Unit provides a maximum of 30 GPM of fertilizer/water solution output. Unit must be installed with bypass and gate valves for flexibility. o Controller: Rain Bird Model ESP 4M Modular Irrigation Controller. Includes an additional 3 zone module to give a total of 7 zones. This controller allows for future expansion up to 13 zones. Has 3 independent programs to give the flexibility. o Includes Galvanized Steel Solenoid Manifold. Installation: (Completed by Vendor) Completion o Will provide all labor and materials to erect greenhouse using professional greenhouse builders. o Upon completion of work, will test all equipment for proper operation. o Instruct school personnel in all aspects of operation and maintenance manuals o on covering and equipment. Electrical o Will furnish all labor and materials to install 4 - 115 volt receptacles, two on each end of greenhouse. o Will furnish all labor and materials to properly wire all greenhouse equipment into 100 amp breaker box. Single Phase 100 Amp Breaker Box Included. o Will furnish all labor and materials to provide necessary utility vapor light lamps with guard installed 12' apart down length of greenhouse. 100 watt bulb included. o National Electric Codes will be adhered to throughout the greenhouse. Plumbing o Will furnish all labor and materials to provide 6 spigots, 2 plumbed to injectors, 3 plumbed to clear water supply utilizing Schedule 40 PVC Pipe or equivalent, 1 Spigot to Be Plumbed to Evaporative Cooling System. o Will furnish all labor and material to plumb evaporative cooling system. Permits o Will be acquired by vendor.

GC Bidding

Educational

$300,000.00

Public - County

New Construction, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
25
Bidding Soon
496
All Active Projects
205
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2025

February 27, 2025

img_map_placeholder

5114 Riverwood Pkwy, Evans, GA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.