BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 17, 2025 at 8:00 PM

Updated March 18, 2025

Site work and paving for a mixed-use development in Visalia, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of February 12, 2025, No award, The Project is scheduled to be awarded at the March 4th 2025 Board Meeting** The work to be done consists, in general, of constructing a single lane roundabout, installing ADA compliant ramps, the placement of aggregate base and hot mix asphalt, construction of roadside drainage swales, installing streetlights, drainage improvements and related striping/signage improvements. The concrete improvements involve the construction of curb and gutter, sidewalk, a concrete apron, and traffic medians. Other items or details not mentioned herein that are required by the plans, Standard Specifications or these Special Provisions must be performed, constructed, furnished or installed. Bidders may visit the project site. The Project is to be completed within ninety (90) working days from the date to be established in the NOTICE TO PROCEED. The Contract includes provisions for Liquidated Damages if the Project is not timely completed. The County establishes a DBE Contract goal of 22% Bids are required for the entire work described herein. Submit the bidder's security in the form of cash, a bidder's bond, or a certified check or cashier's check, in the amount of ten percent (10%) of the amount bid or the bid will be considered nonresponsive The Board of Supervisors reserves the right to reject any or all bids, and/or waive any informality in any bid, and/or determine in its discretion the responsibility of any bidder. The Board of Supervisors further reserves the right to use County Forces, or to negotiate contracts, or both, to the extent authorized by the Public Contract Code. Question Deadline 12/31/2024 at 5:00 PM PT Technical questions should be directed in writing to Michael Winton, P.E. at the Resource Management Agency, 5961 S. Mooney Blvd, Visalia CA 93277 or at RMABids@tularecounty.ca.gov. No questions will be accepted within five (5) working days of the bid opening All questions and responses will be continuously posted on the County website

Award

Roads / Highways

$2,246,311.00

Public - County

Paving, Site Work

58

12

8

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 16, 2025

April 7, 2025

Project location map

Avenue 144 & Rd 96, Visalia, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.