BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in Chillicothe, Ohio. Completed plans call for the renovation of a detention facility.

Project Location 15802 St. Tt. 104 The Chillicothe Correctional Institution (CCI), located at 15802 OH-104 Chillicothe Ohio was originally opened as a State of Ohio prison in 1966. It is a former site of a military camp during the Civil War that later became a federal penitentiary. CCI is currently a medium security prison with the capacity to house approximately 2,950 men. This Request for Qualifications (RFQ) is being issued to obtain Professional Architectural/Engineering (A/E) services for the demolition of the existing hospital facility as well as design of a new energy efficient dorm at the Chillicothe Correctional Institution Ohio. This new facility is expected to be modeled after the recently constructed dorm at the Ohio Reformatory for Women (ORW) located in Marysville Ohio which opened in 2018. This new facility will be a 288-bed housing building, with an expected size of approximately 43,200 square feet. The secure perimeter fence is expected to be moved to allow for demo and construction to occur outside of the secured perimeter with the fence being reinstalled following construction. The development of a complete Program of Requirements (POR) will also be included as part of the Professional Design as an Additional Service. This POR development will include review of the new facility at ORW as well study of the existing site to define the anticipated programmatic scope and the exact building location within the CCI secure perimeter. The project scope will be evaluated, prioritized and defined to align with the project budget. Evaluation of the project construction schedule will also be part of the POR stage. This project will utilize the Construction Manager-at-Risk (CMR) delivery model. It is currently anticipated there will be at least two Guaranteed Maximum Price (GMPs) negotiated according to the General Conditions (CM at Risk Project). One is expected for demolition of the existing building during early design and one for the new building at the completion of the Design Development phase. It is feasible there may be more if determined to be in the best interest of the project.

GC Bidding

Jails / Prisons

$32,500,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
54
Bidding Soon
954
All Active Projects
381
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 15, 2025

May 4, 2026

img_map_placeholder

15802 OH-104, Chillicothe, OH

New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.