BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 21, 2025 at 7:00 PM

Updated September 26, 2025

Site work for a water / sewer project in Marysvale, Utah. Completed plans call for site work for a water / sewer project.

Site Address: Bullion Canyon RD Site Directions: Bullion Canyon is located west of Marysvale Town. Off HWY 89. Refer to plans for specific areas impacted by the Silver King Fire. The Project Consists of the Following: Clearing and Snagging Operations to Address Flood Risks Worsened by Recent Wildfires. The Work Includes the Removal of Vegetation, Fallen Trees, and Debris From Stream Channels and Riparian Areas, Following Nrcs Emergency Watershed Protection (Ewp) Standards. All Trees With a Diameter of 10 Inches or Less Are to Be Removed 12'' From Existing Ground to Restore Natural Flow Conditions, Reduce Obstructions, and Enhance Stream Capacity Ahead of the Spring Runoff. The Project Will Target High-priority Areas in Bullion Canyon and Surrounding Tributaries, Focusing on Debris Clearance While Minimizing Environmental Impacts. Question Deadline 01/08/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Bid Security Shall Be Furnished in Accordance With the Instructions to Bidders. Site visits are to be conducted by appointment only. Contact Kelly Crane, Ensign Engineering, at 435-896-2983 to set up an appointment.

Post-Bid

Water / Sewer

$400,000.00

Public - City

Site Work

15

14

2

6

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
10
Bidding Soon
98
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2025

February 12, 2025

Project location map

Bullion Canyon Rd, Marysvale, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.