Published March 14, 2026 at 8:00 PM

Updated March 15, 2026

Site work and paving for a mixed-use development in Clarinda, Iowa. Completed plans call for site work for a bridge / tunnel; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

BP 01 Low Bidder - A&W Enterprises LLC $775,000 - AWARDED BP 02 Low Bidder - Proctor Corp $1,295,732 - NOT AWARDED BID NUMBER - RFP 944400-01, RFB 944400-02 **As of December 05, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** The lowa Department of Administrative Services will be receiving bids for the replacement of the parking lot & tunnel cap, implementation of a sump pump system, replacement of utility lines, repairing the structural integrity of the tunnel walls and relocation of tunnel access hatches for the Main Building to the SW Wing underground tunnel at the Clarinda Correctional Facility, Clarinda, lowa 51632. PROJECT ADDRESS: Clarinda Correctional Facility (CCF) 2000 N. 16th St. Clarinda, Iowa 51632 The Bid Shall be accompanied by a Bid Security as set forth in the Instructions to Bidders in the amount of 5% of the total bid amount. Each bid shall be accompanied by a bid bond, cashier's check or a certified check drawn upon a solvent bank chartered under the laws of the United States of America. The Iowa Department of Administrative Services anticipates construction to begin on April 6th, 2026 and end on August 28th, 2026. Question Deadline 11/06/2025 at 2:00 PM CT. Questions must be submitted to Michael Bradbury - Issuing Officer Phone: (515) 823-9327 E-Mail: construction.procurement@iowa.gov Question Deadline 02/12/2026 at 2:00 PM CT Scope Applicable to All Bid Packages: 1. The Contractor's Work includes all labor, supervision, materials, equipment, services, supplies, tools, facilities, transportation, hoisting, storage, receiving, licenses, inspections, certifications, overhead, profit, or other items required or reasonably inferable to properly and timely perform and complete all work and services to be performed by the Contractor pursuant to this Agreement. Unless specifically stated otherwise, incidental work required to accomplish the work of this Bid Package shall be included the bid. This would include, but not be limited to, temporary facilities, protection of the work, security of equipment, materials, and work in progress, etc. Contractor's Work shall be performed in accordance with the Drawings, Specification Divisions 00 and 01, and Specification sections applicable to each Contractor's scope. 2. Contractor is responsible for all labor and equipment to unload, account for all material delivered, stock, and delivery for this scope of work. Storage and delivery of materials and equipment at the Site shall be permitted only to the extent approved in advance by the Construction Manager, and if anything so stored obstructs the progress of any portion of the work, it shall be promptly removed or relocated by the Contractor without reimbursement. 3. On site supervision by Prime Contractor at all times work by that contractor or their subcontractors/suppliers is taking place. 4. Provide all temporary facilities required for this scope of work including trailer, trailer power, telephone, secured storage, temporary power for work, temporary and task lighting for work, etc. as determined necessary by Contractor. Coordinate location of trailers, material storage and utility lines with Construction Manager. Limited space is available, and permission to bring any such facility or excess materials on to the site shall be approved by the Construction Manager. 5. Contractor shall provide all equipment and tools for Contractor's own cleanup. Clean up shall be done at end of every shift or more frequently if required for the Contractor to perform their work, for other Contractors to perform their work, as required by the Owner's operations, and at the discretion of the Construction Manager. 6. All turf, landscaping, and subgrade disturbances caused by equipment traffic or other activities related to the Contractor's scope shall be repaired or restored to proper conditions by the Contractor. 7. Protect adjacent existing building elements from damage from Scope of work. Repair existing building elements damaged during Contractor's Scope of work. 8. Contractor to provide dust and debris control as necessary to protect adjacent areas of construction. 9. Contractor to provide cleaning of the work area at minimum on a daily basis.WQAC 10. Contractor personnel shall immediately report lost or missing tools. 11. The owner has limited resources for escorting individuals in and out of the facility. The contractor shall conduct construction activities to minimize the amount of travel in and out of the facility during the construction workday. Bid Results: Bid Package 02 Rasmussen Mechanical inc. $739,439 Bid Package 03 O'Neal Electric Company $44,000

Award

Bridges / Tunnels

$783,439.00

Public - State/Provincial

Paving, Site Work

44

14

6

5

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
24
Active Projects
1
Bidding Soon
588
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2026

April 22, 2026

Project location map

2000 N 16th St, Clarinda, IA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.