BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 5, 2025 at 7:00 PM

Updated February 6, 2025

Renovation of an educational facility in Skokie, Illinois. Completed plans call for the renovation of a educational facility.

Niles West Fieldhouse Translucent Panel Replacement Attendance Shall Be Taken at the Sites to Ensure That All Contractors Have Visited the Sites. Non-attendance Can Be Grounds for Rejection of Bid. Document notes The Required Qualification Documents Must Be Delivered Along With the Bidder's Sealed Bid at the Same Place and Time Required for the Bid. Contents of Each Bidder's Qualification Documents Will Be Available for Public Review. The Qualification Documents Will Be Reviewed by the Owner and Architect to Determine the Lowest Responsible Bidder. the Board of Education Reserves the Right to Reject Any or All Bids or Parts Thereof or Waive Any Irregularities or Informalities in Bidding. This Contract is Subject to the Illinois Prevailing Wage Act (820 Ilcs 130/1 Et Seq.). Qualification: Each Bidder Must Satisfactorily Complete the Qualification Process Described in Section 004395 -general Requirements of the Project Manual, by Providing the Required Qualification Documents. Checks or Drafts of Unsuccessful Bidders Will Be Returned as Soon as Practical, After Opening and Checking the Bids. Successful Bidder Must Provide a Performance Bond and a Labor and Material Payment Bond in the Full Amount of the Contract, Acceptable Each Bid Must Be Accompanied by a Bid Guarantee in the Form of a Bid Bond, Certified Check or Bank Draft in an Amount Equal to and Not Less Than Ten Percent (10%) of the Bid and Made Payable to "niles Township High School District #219" No Bid Shall Be Withdrawn for a Period of Sixty (60) Days After the Bid Opening Date Without the Consent of the Owner. Site Walkthrough notes Attendance Shall Be Taken at the Sites to Ensure That All Contractors Have Visited the Sites. Non-attendance Can Be Grounds for Rejection of Bid. Requests for Interpretations: 1. Submit requests for interpretation of the documents in writing to the Architect. Inquiries received five or more days prior to the date fixed for opening of the Bids will be given consideration. 2. Responses to requests for interpretation will be issued as Addenda. Addenda will be issued to bidders of record. It is the responsibility of the bidders to check to be certain they have the issued Addenda.

Award

Educational

$512,544.00

Public - City

Renovation

8

13

5

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
499
Active Projects
276
Bidding Soon
3,617
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 16, 2025

May 27, 2025

Project location map

5701 Oakton St, Skokie, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.