BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a water / sewer project in Little Chute, Wisconsin. Completed plans call for site work for a water / sewer project.

Holland Road is currently a rural road section with asphalt pavement, gravel shoulders, and ditches to convey local storm water. The proposed resurfacing project will remove the existing road surface and base material of approximately 1,311 cubic yards of common excavation before reconstructing the road corridor. Proof rolling of the existing clay foundation will take place along with any amendments that may be required to create an adequate foundation. Approximately 915 cubic yards of compacted 1-1/4" granular road aggregate material shall be installed at a thickness of 12 inches. The project shall include approximately 2,580 square yards of asphalt pavement: 3-1/4" of 3 LT 52-28 S Lower and 1-3/4" of 4 LT 52-28 S upper for a total asphalt pavement thickness of 5 inches. Roughly 30 cubic yards of compacted 3/4" granular dense aggregate will be utilized for shouldering material which will tie into the existing shouldering material. Cooperation will be necessary with the WisDOT contractor during the grading and paving phases of the contract (separate bids). Site Directions: The project will extend approximately 890 linear feet on Holland Road from the intersection of W. Elm Street north towards the interstate 41 overpass bridge. The interstate 41 bridge will also be under construction concurrently with a WisDOT project related to the interstate 41 expansion project.

GC Bidding

Water / Sewer

$1,000,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
23
Bidding Soon
291
All Active Projects
119
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2025

March 10, 2025

img_map_placeholder

To Be Determined, Little Chute, WI

Related To This Project


New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.