BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 10, 2025 at 8:00 PM

Updated April 11, 2025

Site work for a water / sewer project in East Dubuque, Illinois. Completed plans call for site work for a water / sewer project.

As of April 10, 2025, this project has not yet been awarded. A timeline for award has not yet been established. The City Council will accept and consider the Bids received at 6:00 p.m. local time on February 17, 2025 at City Hall, 261 Sinsinawa Avenue, East Dubuque, Illinois. The extent of the work included in the Wastewater Collection System Improvements 2025 project includes extending gravity sanitary sewer service to a portion of a subdivision that is located outside of the City of East Dubuque that is currently served by private on-site septic systems. The project includes the installation of approximately 4,900 lineal feet of sanitary sewer main and 4,100 lineal feet of sanitary sewer service line. The sanitary sewer installation includes precast concrete manholes, surface restoration including HMA and PCC patching, erosion control measures and seeding. Additionally clearing and grubbing of portions of the site will be required to make the proposed improvements. It is also anticipated that rock excavation will be required for portions of the proposed sanitary sewer installation. Each bidder shall accompany its bid with bid security in the form of a bid bond, bank draft, cashier's check, or certified check payable to the City of East Dubuque for 5% of the total amount of the bid. Work on the improvement shall commence on or before the date specified in the written "Notice to Proceed" with Substantial Completion by May 1, 2026, and Final Completion by June 1, 2026. Liquidate damages in the amount of $3,000.00 will be assessed for each day that the work shall remain uncompleted after the end of the final completion date, with due allowance for extension of contract period due to conditions beyond the control of the Contractor, as approved by the Owner. The City of East Dubuque reserves the right to reject any or all Bids or to waive any informalities in the bidding.

Bid Results

Water / Sewer

$1,348,190.00

Public - City

Site Work

38

14

7

6

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Fencing, Execution and Closeout Requirements, Examination and Preparation, Execution, Application
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Fine Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
39
Bidding Soon
648
All Active Projects
249
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2025

March 13, 2025

img_map_placeholder

Multiple Locations, East Dubuque, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.