Published September 23, 2025 at 8:00 PM

Updated September 24, 2025

Site work for a water / sewer project in Beaumont, California. Design plans call for site work for a water / sewer project.

As of September 23, 2025, this project is in design. The architect has been identified and information regarding the method of general contractor selection is unavailable. A firm construction timeline has not been established. Closed solicitation has been included below for reference. The District is currently seeking proposals from qualified engineering consulting firms for engineering design, survey, and environmental services required for this Project. The services would include the work described hereafter and detailed in Section III: Scope of Work and Technical Specifications. The District has currently budgeted for six (6) identified sections of water pipeline requiring construction or replacement and intent of this proposal is to provide engineering and environmental services related to the six (6) budgeted sections of water pipeline. The proposed water pipeline sections identified within this Request for Proposal (RFP) will be designed in an effort to assist District staff with the on-going capital improvement projects. Residential homes and/or commercial businesses are in close proximity to replacement pipelines and noise and other construction impacts and considerations will need to be addressed during construction. A list of the six (6) proposed pipeline sections requiring design effort are listed hereafter. Pipeline 1: The District owns and operates an aging 2-in diameter riveted steel waterline approximately 435 feet in length, located within Elm Avenue from approximately from 6th Street to 7th Street in the City of Beaumont. Said pipeline has reached the end of its service life. The District plans to replace the 2-in diameter waterline within Elm Avenue with an 8-in diameter ductile iron pipe (DIP). Pipeline 2: The District currently owns and operates an existing 10-in steel waterline which has reached the end of its service life. Said pipeline is located within Egan Avenue from 5 th Street to 6th Street. The District plans to construct a new 8-in diameter ductile iron pipe (DIP) replacement waterline located within Egan Avenue located between an existing waterline within Egan Avenue and 6th Street to the existing waterline within California Avenue. District staff estimates the proposed waterline will be approximately 1,050 feet in length. The existing homes on Egan Avenue are currently served from two pipelines in the two parallel alleys, east and west of Egan Avenue. The existing services shall be rerouted from the alleys to the front of the properties at the new pipeline location and shall take service from said pipeline in Egan Avenue. The existing two (2) alley pipelines shall be severed and abandoned in place. Pipeline 3: There is currently no waterline within Wellwood Avenue, however, the District plans to construct a new 8-in diameter ductile iron pipe (DIP) waterline within Wellwood Avenue from 5th Street to 8th Street. District staff estimates the waterline will be approximately 1,220 feet in length. The existing homes on Wellwood Avenue are currently served via the two separate pipelines in the alleys that parallel Wellwood Avenue to the east and west of Wellwood Avenue. The existing services shall be rerouted from the alleys to the front of the properties at the new pipeline location and shall take service from said pipeline in Wellwood Avenue. The existing two (2) alley pipelines shall be severed and abandoned in place. Pipeline 4: The District owns and operates an aging 6-in diameter riveted steel waterline approximately 1,164 feet in length, located within Orange Avenue from E. 6th Street to E. 8 th Street in the City of Beaumont. The existing 6-in waterline has reached the end of its service life. The District intends to replace the 6-in diameter waterline within Orange Avenue with an 8-in diameter ductile iron pipe (DIP). Pipeline 5: The District owns and operates an aging 6-in diameter riveted steel waterline approximately 1,330 feet in length, located within Lincoln Street from Noble Street to the westerly street end in Cherry Valley. The existing 6-in waterline has reached the end of its service life. The District plans to replace the 6-in diameter waterline within Lincoln Street with an 8-in diameter ductile iron pipe (DIP). Pipeline 6: The District owns and operates an aging 6-in diameter asbestos cement pipe waterline approximately 1,036 feet in length, perpendicular to Avenida Sonrisa and located 1,030 feet west of Avenida Timoteo and extends northerly from Avenida Sonrisa to Avenida Miravilla in Cherry Valley. The existing 6-in waterline has reached the end of its service life. The District intends to replace the 6-in diameter waterline with an 8-in diameter ductile iron pipe (DIP). Question Deadline 12/23/2024 at 3:00 PM PT Response to Written Questions Regarding RFP 12/30/2025 @ 5:00 pm. Any questions as to the meaning of the scope of work and/or other pre-proposal documents must be submitted in writing by the deadline for Request for Information dated listed herein and shall be directed to Mark Swanson at (951) 845-9581, Ext. 218, mark.swanson@bcvwd.gov. Contract Approval and Approximate Start Date 2/4/2025 Anticipated Projected Award Date: Anticipated Project Design Completion: January 23, 2025 August 29, 2025 The method of Contractor Selection has not been Determined at this time.

Design

Water / Sewer

$1,000,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
482
Active Projects
118
Bidding Soon
2,994
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.