EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 18, 2025 at 7:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Steinhatchee, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Counties : Dixie, Lafayette Road Name: SR 51 From the Dixie County Line to Mayo - Resurfacing Limits: 33040000 Project(s): 21008525201(*) Federal Aid No: N/A Project(s): 21008535201 Federal Aid No: N/A Total Roadway Length: 20.208 Miles Total Bridge Length: 0.000 Miles Total Proposal Length: 20.208 Miles Contract Days: 150 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time:15 Days (acq. time) Description: Sr 51 From the Dixie County Line to Mayo, Sr 51 From Taylor Co Line to Lafayette Co Line) the Improvements Under This Contract Consist of Milling & Resurfacing, Shoulder Treatment, Highway Signing, and Other Incidental Construction on Sr 51 From The Dixie County Line to Mayo and From Taylor County Line to Lafayette County Line in Dixie County. Prequalification Required. Question Deadline 01/08/2024 at 5:00 PM ET Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 003 - Hot Plant-Mixed Bituminous Courses - SR51

Bid Results

Roads / Highways

$12,715,932.00

Public - State/Provincial

Paving, Site Work

96

5

5

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
26
Bidding Soon
357
All Active Projects
169
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 15, 2025

March 17, 2025

img_map_placeholder

FL-51, Steinhatchee, FL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Hot Plant-Mixed Bituminous Courses - SR51

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.