EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 28, 2025 at 7:00 PM

Updated October 1, 2024

Site work and paving for a sidewalk / parking lot in Florala, Alabama. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Bracket Estimate on This Project is From $500,000-$550,000. This Bracket Range is Shown Only to Provide General Financial Information to Contractors and Bonding Companies Concerning the Project's Complexity and Size. This Bracket Should Not Be Used in Preparing a Bid, Nor Will This Bracket Have Any Bearing on the Decision to Award the Contract. The Principal Items Are Approximately as Follows: 101x-510 Removing Asphalt 49 Sy 206c-000 Removing Concrete Sidewalk 82 Sy 206d-002 Removing Curb 224 Lf 618a-000 Concrete Sidewalk, 4" Thick 1037 Sy 618b-003 Concrete Driveway, 6" Thick (Includes Wire Mesh) 268 Sy 623b-002 Concrete Curb, Type a 148 Lf 623c-003 Combination Curb & Gutter, Type C (Modified) 922 Lf 654a-000 Solid Sodding 900 Sy.

Post-Bid

Sidewalks / Parking Lot

$550,000.00

Public - City

Paving, Site Work

31

6

2

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application
Division 08 - Openings

Division 08 - Openings

Hardware
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Hooks
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
27
Bidding Soon
398
All Active Projects
196
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2025

February 27, 2025

img_map_placeholder

Multiple Locations, Florala, AL

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Sidewalks Along Sgt. Josh Turner St. And Begonia St.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.