Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 3, 2025 at 8:00 PM
Updated September 4, 2025
Site work and paving for a mixed-use development in Gilbert, Arizona. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and road / highway.
A general description of the Project is: This project will begin with a Design Concept Report (DCR) FY26, with full design and construction funding coming in FY27. Project includes Design and construction of the core portion of Water Tower Way located between Vaughn Ave. and Page Ave. on the existing Ash Street alignment.The total program budget for the project is $282,000 for FY26 and approximately $12.2M for FY27, including internal and external costs. Scope of work will include the development of a pedestrian path and flexible public space to accommodate, pedestrians, special events such farmer's markets or small-scale festivals or use as a passive public space within the Heritage District. Project elements will include the conversion of the existing Ash Street to a pedestrian path with hardscape and streetscape improvements, street furniture, lighting, signage, drinking fountains, public art and associated utility improvements to support market and entertainment setups such as electrical and fiber. The Vaughn Ave and Page Ave pedestrian crossings will also be improved to coordinate with the landscape palette and hardscape of the core area and allow for curb areas for commercial loading zones and food trucks. Right to Reject SOQ: GILBERT reserves the right to waive any irregularities in any submittal and to reject all submittals and re-advertise or cancel the project in its entirety, at its sole discretion. GILBERT, or its consultants and advisors, will not be responsible for any cost incurred by any firm submitting a SOQ or responding to this notice. Equal Opportunity: GILBERT is an equal opportunity employer. Minority and women's business enterprises are encouraged to submit on this Project.
Conceptual
Roads / Highways
$12,482,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 30, 2026
Ash St, Gilbert, AZ
Related To This Project
Gilbert, AZ
--
Gilbert, AZ
Bid Date: Nov 21 2025
Gilbert, AZ
Bid Date: Oct 08 2025
Gilbert, AZ
--
Gilbert, AZ
Bid Date: Jan 15 2026
Gilbert, AZ
Bid Date: May 30 2019
Gilbert, AZ
Bid Date: Dec 18 2025
Gilbert, AZ
--
Gilbert, AZ
--
Gilbert, AZ
--
Gilbert, AZ
Bid Date: Sep 04 2025
Gilbert, AZ
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
