BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Fort Bragg, North Carolina. Conceptual plans call for the construction of a military facility; for site work for a military facility; and water / sewer project.

The objective of this project is to design a RTI (Regional Training Institute) pavilion measuring 48 feet by 60 feet on a concrete pad with power, lighting, and water. This pavilion will serve as an outdoor classroom to facilitate training at the 139th Regiment Military Academy. The structure will need to include electrical outlets, lighting, trash receptacles, and modular outdoor seating and storage options for the classroom. To determine the best location for the pavilion at 4595 Butner Road, Fort Liberty, NC, investigative services are required. These services will involve locating underground utilities, assessing elevation changes, and providing other assistance necessary for cost estimates and feasibility analyses for construction in three potential areas. This project's construction is contingent upon receipt of Federal funds. Initial Design funds are fully funded. These funds will support 100% Design, through Construction Documents (CD). Proceeding with Bidding, Construction Administration, and Closeout will be contingent upon receipt of Federal funding. The NCNG will provide, planning documents, and other related program documents that detail potential future force structure and work activities on the complex for the Designer to Develop and Evaluate Alternatives. As a federally funded, state executed project this project will follow both State and Federal guidelines. The design team should use the following references as basis for design and construction requirements: a) NC State Construction Manual b) Army Regulation 420-1, Army Facilities Management, Chapter 10 c) NGR 415-5, Military Construction Program Execution d) NGR 420-10, Construction & Facilities Management Office Operations e) NG Pamphlet 415-12, Army National Guard Facilities Allowances f) ARNG Design Guide 415-5, General Facilities Information Design Guide g) Unified Facilities Criteria (UFC) 1-200-1, DoD Building Code w/ Change 3 h) Unified Facilities Criteria (UFC) 2-100-01, Installation Master Planning with Change 3 The method of Contractor Selection has not been Determined at this time.

Conceptual

Military

$800,000.00

Public - State/Provincial

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
26
Bidding Soon
1,233
All Active Projects
490
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2026

img_map_placeholder

4595 Butner Rd, Fort Bragg, NC


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.