Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 13, 2025 at 8:00 PM
Updated March 14, 2025
Site work for a water / sewer project in Fountain Valley, California. Completed plans call for site work for a water / sewer project.
The work to be performed and bid complete herein, shall be as shown and specified in the Technical Specifications and on the Plans and is generally described as supplying all labor, equipment, materials and forces necessary to complete work for replacement of three 30-inch check valves in the City of Anaheim, including replacement of adjacent steel pipe spools and installation of isolation kits COMPLETION OF WORK AND LIQUIDATED DAMAGES: Work must be substantially completed within two-hundred forty (240) consecutive calendar days from the date of the Notice to Proceed issued by the District, Failure to complete the Work within the time set forth herein will result in the imposition of liquidated damages for each day of delay, in the amount set forth in the Information for Bldders. BID GUARANTEE: Each Bid shall be accompanied by one of the following a certified or cashiers Check, or bid bond in an amount not less than ten percent (10%) Of the total bid price. payable to the Orange County Water District, as a guarantee that the Bidder. if its Bid is accepted, shall promptly execute the Agreement, furnish a satisfactory Faithful Performance Bond in an amount not less than one hundred percent (100%) of the total bid price. furnish a Labor and Material Bond in an amount not less than one hundred percent (100%) of the total bid price, and fumish certificates evidencing that the required insurance is in effect in the amounts set forth in the Insurance Conditions. The Faithful Performance Bond shall remain in full force and effect through the guarantee period as specified in the General Provisions_ All surety companies shall be admitted surety insurers and shall comply with the provisions of Code of Civil Procedure Section 995630.
Bid Results
Water / Sewer
$347,500.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 28, 2025
February 27, 2025
Multiple Locations, Fountain Valley, CA
Related To This Project
Fountain Valley, CA
Bid Date: Jan 07 2025
Fountain Valley, CA
Bid Date: Jan 23 2025
Fountain Valley, CA
Bid Date: Jan 28 2025
Fountain Valley, CA
Bid Date: Feb 24 2021
Fountain Valley, CA
--
Fountain Valley, CA
Bid Date: Mar 05 2025
Fountain Valley, CA
Bid Date: Mar 31 2025
Fountain Valley, CA
Bid Date: May 06 2025
Fountain Valley, CA
Bid Date: Mar 18 2025
Fountain Valley, CA
Bid Date: Jan 22 2025
Fountain Valley, CA
--
Fountain Valley, CA
Bid Date: Oct 28 2024
Fountain Valley, CA
Bid Date: Dec 09 2024
Fountain Valley, CA
Bid Date: Nov 14 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
