BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 22, 2025 at 8:00 PM

Updated May 7, 2025

Site work for a water / sewer project in Fountain Valley, California. Completed plans call for site work for a water / sewer project.

The Contractor shall furnish all labor, materials, equipment and incidentals required to complete construction of the MF West Basement Acoustic Panel Project per the plans and specifications, including installation of acoustic panels and site cleanup. The work is within the existing Microfiltration West building within the treatment facility at the District's main office. The address is 18700 Ward Street, Fountain Valley, CA 92708. The Contractor shall complete Work in sequence listed below. Completion dates of the various stages shall be in accordance with the approved construction schedule submitted by the Contractor. Question Deadline 03/20/2025 at 2:00 PM PT All questions regarding the Bid must be submitted in writing Questions received after the questions due date may not be considered. All questions relative to this project prior to the opening of bids shall be directed, in writing, to OCWD: ORANGE COUNTY WATER DISTRICT 18700 Ward Street Fountain Valley, CA 92708 Attention: Audrey Perry, Project Manager Telephone: (714) 378-3369 Email: procurement@ocwd.com Mailing Address: P.O. Box 8300 Fountain Valley, CA 92728-8300 COMPLETION OF WORK AND LIQUIDATED DAMAGES: All Work must be substantially completed within ONE-HUNDRED TWENTY (120) consecutive calendar days from the date of the Notice to Proceed issued by the District. Failure to complete the Work within the time set forth herein will result in the imposition of liquidated damages for each day of delay, in the amount set forth in the Information for Bidders. BID GUARANTEE: Each Bid shall be accompanied by one of the following: a certified or cashier's check, or bid bond in an amount not less than ten percent (10%) of the total bid price, payable to the Orange County Water District, as a guarantee that the Bidder, if its Bid is accepted, shall promptly execute the Agreement, furnish a satisfactory Faithful Performance Bond in an amount not less than one hundred percent (100%) of the total bid price, furnish a Labor and Material Bond in an amount not less than one hundred percent (100%) of the total bid price, and furnish certificates evidencing that the required insurance is in effect in the amounts set forth in the Insurance Conditions. The Faithful Performance Bond shall remain in full force and effect through the guarantee period as specified in the General Provisions. DISTRICT'S RIGHTS RESERVED: The Orange County Water District reserves the right to reject any or all bids , and to waive any informality in any bid.

Post-Bid

Water / Sewer

$831,000.00

Public - County

Site Work

48

10

4

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
585
Active Projects
283
Bidding Soon
4,008
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2025

June 5, 2025

Project location map

18700 Ward St, Fountain Valley, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.